-
The natural gas pipeline project on the south main line of Shandong Pipeline Network started
Time of Update: 2021-09-17
Sinopec News Network reported on March 31 that the construction of the natural gas pipeline project of the South Main Line of the Shandong Pipeline Network of Sinopec Natural Gas Branch started construction.
-
Hubei Chemical Fertilizer violates regulations and joint responsibility to ensure production and construction safety
Time of Update: 2021-09-17
. In order to implement strict management requirements, eliminate serious violations, reduce general violations, effectively prevent and contain accidents in direct operations, and ensure production and construction safety, the company has issued rules for the assessment of violations and joint responsibility to further improve the management, supervision, and supervision of direct operations.
-
Luoyang Petrochemical No. 1 polypropylene granulator has a record operating cycle
Time of Update: 2021-09-17
"This is the longest operation cycle of the granulator since the device has a production record.
The extension of the operation cycle of the granulator creates conditions for continuous and stable production.
-
Shanghai Offshore Oil Bureau and China Petroleum Exploration Institute signed a strategic cooperation agreement
Time of Update: 2021-09-17
Sinopec News Network reported on March 31, Sinopec Shanghai Offshore Oil Bureau and Sinopec Petroleum Exploration and Development Research Institute signed a "strategic cooperation agreement" in Shanghai.
They must use high-quality research and high-quality cooperation to provide strong technical support for the high-quality exploration and development of Sinopec’s offshore areas.
-
Yakela Gas Production Plant completed the deployment of 2 new wells
Time of Update: 2021-09-17
Recently, the DLK15H well and DLK16 well deployment plan submitted by the Yakela Gas Production Plant of Northwest Oilfield has successfully passed the review and approval. So far, in 2021, the plan
-
Tarim Oilfield achieved a good start in the first quarter, producing 8.48 million tons of oil and gas
Time of Update: 2021-09-17
This year is the first year that Tarim Oilfield has started a new journey of 40 million tons production after the completion of a 30 million tons large oil and gas field with high quality.
-
The Xinjiang Uygur Autonomous Region's energy supply security continued to improve in the first two months
Time of Update: 2021-09-17
66 billion kWh, a year-on-year increase of 11.
66 billion kWh, a year-on-year increase of 11.
-
Changling Refinery strengthens on-site inspection and management of overhaul
Time of Update: 2021-09-17
The operation area entered the tower many times and negotiated with the construction party about the demolition plan of the internal structure of the restricted space.
In the normal pressure catalytic construction area of the second oil refinery, the operators have to remove the grid of the 9th floor of the tower.
-
Sino-Korea Petrochemical Railway sets a new historical record
Time of Update: 2021-09-17
The company’s market operations department carefully deploys to ensure reasonable railway loading and the number of tank cars entering the station.
-
Jiujiang Petrochemical fully launched the largest overhaul
Time of Update: 2021-09-17
Sinopec News Network reported on April 1, Jiujiang Petrochemical launched the largest scale of inspection and modification, focusing on solving the bottlenecks that restrict the long-term stable operation of the equipment, improving efficiency, and laying the foundation for accelerating transformation and upgrading and promoting high-quality development.
-
Nanjing Engineering Luoyang Commercial Reserve Project launches quality day activities
Time of Update: 2021-09-17
com, the Luoyang Commercial Storage Project Department of Nanjing Engineering Storage and Transportation Branch carried out the signing activity of "Improving Product Quality, We Must Start with Me".
-
Shanghai Petrochemical achieves the goal of green parking for maintenance
Time of Update: 2021-09-17
In order to do a good job in environmental protection work during plant shutdown, the department started with formulating a special plan, strengthened on-site management and control, optimized treatment processes, and selected environmental protection equipment to better achieve the goal of green parking.
-
"Ten Red Lines" of Yangzi Petrochemical Storage and Transportation Plant Standardize Field Operation
Time of Update: 2021-09-17
In order to further standardize on-site operations and establish red line awareness, Yangzi Petrochemical Storage and Transportation Plant has recently implemented the "HSSE Management Ten Red Lines" measures to strengthen the safety management of direct production operations and direct construction operations.
-
Anqing Petrochemical carefully organizes to ensure the safe and smooth delivery of jet fuel
Time of Update: 2021-09-17
, the problem of aviation fuel supply at Nanchang Changbei International Airport during the maintenance period of Jiujiang Petrochemical was solved.
-
Chongqing Drilling: Obtained two national patents
Time of Update: 2021-09-17
It is reported that the patent of "an anti-flammability and explosion-proof diversion device for air drilling" declared by the company can quickly and effectively adsorb the natural gas in the wellbore during casing operation and discharge it into the combustion pool for combustion, so that the pure natural gas in the wellbore is not The rotating blowout preventer will overflow to the drill floor to ensure the safety of casing running operations.
-
Anqing Petrochemical Thermal Power Department strengthens ash pipeline inspection to ensure safe and environmentally friendly production
Time of Update: 2021-09-17
China Petrochemical News Network News Since this year, the Anqing Petrochemical Department of Thermal Power has formulated measures to strengthen the inspection of the ash pipeline from the operation department to the Chenjiachong ash yard to ensure the safe operation of the ash pipeline without running, dripping, and causing environmental impact.
-
[News story] Twists and turns to check for leaks
Time of Update: 2021-09-17
Two days ago, Guo Shuli, the deputy director of the oil workshop of Tianjin Petrochemical, reported that there were rare materials and the smell of oil and gas on the south bank of the Bameter River on the south side of Gangtang Highway in Binhai New Area, and he immediately rushed to the scene.
-
Jinling Petrochemical and the academician team discussed the development of digital transformation
Time of Update: 2021-09-17
Recently, Jinling Petrochemical and the team of Academician Qian Feng of East China University of Science and Technology conducted exchanges and discussions on accelerating the digital transformation of the petrochemical industry, providing ideas for promoting high-quality development of the company.
-
Zhongyuan Petroleum Engineering: awakening the sleeping "black gold" underground
Time of Update: 2021-09-17
Although volume fracturing technology has been the core technology for effective production of tight reservoirs at home and abroad, Dongpu tight oil reservoirs have the characteristics of deep burial, small single layer thickness, complex lithology, and poor connectivity.
-
Chongqing Drilling: Equipment Management Boosts Drilling Speed
Time of Update: 2021-09-17
"The equipment management of your well team is meticulous and meticulous, the training is new, the small reforms are effective, and many characteristic practices are worthy of promotion.
The equipment management of the well team implements fixed personnel, fixed machine, regular and fixed-point maintenance, and the responsibility area is divided according to the team.