-
Nanjing Engineering won the bid for Jiangsu Petroleum rooftop photovoltaic power generation project
Time of Update: 2021-08-28
com recently, Nanjing Engineering Company Electric Instrument Branch successfully won the bid for rooftop photovoltaic power generation projects such as the refueling (gas) station of Jiangsu Petroleum Branch, making a breakthrough in the field of new energy construction .
-
Henan Oilfield Belt Conveyor Moving Device Solves Major Production Problems
Time of Update: 2021-08-28
Yang Qingan said that the vertical belt pumping unit has been promoted in Henan Oilfield because of its advantages of long stroke, slow stroke, easy maintenance, and high efficiency.
-
"Magnifying Glass" Explores Reservoirs in Jianghan Old Area and Obtains "Treasures"
Time of Update: 2021-08-28
Sinopec News Network reported on August 5, after the fracturing of the exploration evaluation well Guang 7901 in the southern slope block of the Banghu syncline, a high-yield industrial oil stream with a daily output of 27 cubic meters was obtained .
-
Jianghan Oilfield Green Purchasing Helps the Establishment of Healthy Enterprises
Time of Update: 2021-08-28
In the bidding evaluation and contract signing, the center clarified the specific requirements of green procurement, and gave priority to purchasing green products that have passed environmental labeling product certification, energy-saving and water-saving environmental product certification, low-carbon product certification, and green building materials product certification.
-
Chuanwei Chemical's foreign trade products "new channel" to reduce transportation costs
Time of Update: 2021-08-28
In the future, the export of Chuanwei chemical products will use this rail-sea combined transportation channel and be shipped via the "Yuba Railway Special Line", which can realize packing at the origin, customs declaration, and direct shipment to the sea at Qinzhou Port in Guangxi, which can save transportation time and vehicle short-distance charges, per ton.
-
A big step forward in the construction of Shengli Offshore Intelligent Injection and Production Demonstration Zone
Time of Update: 2021-08-28
A few days ago, the large-diameter layered sand control intelligent water injection technology implemented by the Shengli Oilfield Petroleum Engineering Technology Research Institute was successfully tested in the CB25GB-2 well of the marine oil production plant, marking the construction of the CB20C intelligent injection-production demonstration zone in the Shengli Offshore Oilfield Take a big step forward .
-
The first-class qualification rate of Yangzi Petrochemical's alkylated oil reaches 100%
Time of Update: 2021-08-28
Combining the "Comparing, Learning, Helping and Surpassing" activities and the team labor competition, they formulated the "Alkylation Device Key Parameters Control and Assessment Table", refined the quality index evaluation standards, strengthened quality tracking and assessment, and combined with the rationalization of the device, a daily one We will give corresponding rewards to teams and individuals who propose quality optimization, so that product quality management responsibilities and powers are clear, implemented at various levels, and rewards and punishments are clearly defined.
-
In July 2021, the national coke production was 38.79 million tons, down 2.9% year-on-year
Time of Update: 2021-08-28
79 million tons, a year-on-year decrease of 2.
On a month-on-month basis, the coke production in July 2021 decreased by 120,000 tons from the 38.
91 million tons in June, a decrease of 0.
9 percentage points from the previous June and 3.
-
Chuanwei Chemical's self-control rate improvement work has achieved initial results
Time of Update: 2021-08-28
After nearly three months of hard work, the automatic control rate of Chuanwei Chemical's production equipment has continued to be significantly improved, and the overall automatic control rate has stabilized at 92.
-
Jianghan Oilfield intensive farming "experimental field" to improve oil recovery
Time of Update: 2021-08-28
News from Sinopec News "After five years of research and research, the polymer flooding field test has achieved initial results: At present, the injection pressure in the test area has increased by 1 MPa, the water cut of the well group has dropped by 3%, and the production has shown an upward trend, especially The key wells of the central well have been effective .
-
Northeast Oil and Gas Material Management Achieved "Two Upgrading and One Down"
Time of Update: 2021-08-28
Standardize management, reduce the material backlog rate by 31%, increase the procurement capital saving rate to 10%, and increase the material quality qualification rate to 99.
-
Three-year treatment of Tahe 4th District in Northwest Oilfield to triple daily crude oil production
Time of Update: 2021-08-28
27 million tons of reserves in the middle and deep parts were out of control Three years ago, Wang Jiale, director of the Development Research Institute of the First Oil Production Plant, was very anxious about the development status of Tahe Four District: "The conventional water and gas injection methods have been exhausted, and the daily output of the block is still hovering at 220 tons .
-
Changling Refining and Petroleum Refining No. 1 to achieve the establishment of a three-base model
Time of Update: 2021-08-28
China Petrochemical News Network reported in recent years, Changling Refining & Chemical Refining Division 1 has been planning according to the "three bases" model work, focusing on the safety of equipment production, strengthening KPI indicator management, focusing on consolidating grassroots construction, refining basic work, and Strengthening the three aspects of basic skills training and steadily advancing the creation of the "three bases" model, which has achieved more obvious results .
-
Nanjing Engineering Jiujiang Aromatics Project promotes standardization construction
Time of Update: 2021-08-28
Nanjing Engineering Jiujiang Petrochemical Aromatics Project will continue to deepen the construction of project standardization management system and strengthen project management to ensure the full implementation of standardization measures such as safety, quality, and team construction, and to promote project construction with high quality .
-
The repair of the main absorption tower of the second unit of the Puguang Gas Field is completed
Time of Update: 2021-08-28
By formulating and implementing the "Tower Repair HSSE Special Guarantee Plan", establishing a quality control team composed of relevant personnel from the branch equipment department, plant equipment office and local workshops, and rationally optimizing the maintenance period, the project was successfully completed with high quality .
-
Yangtze's ethylene production continues to increase profitability with high quality
Time of Update: 2021-08-28
Overcome difficulties and eliminate production "bottleneck" At 7:40 in the morning of July 28th, Zhang Yan, deputy director of the ethylene unit of the Yangzi Petrochemical Olefin Plant, and Sun Guangdao and Wang Wenchao, technicians of the compression area, came to the DCS console in the control room No.
-
IHS Markit: U.S. crude oil meets more than half of Canada's import demand for crude oil and condensate
Time of Update: 2021-08-28
Foreign news agency news on August 11, the industry analysis agency IHS Markit said in a report on Wednesday that US crude oil meets more than half of Canada's crude oil and condensate import needs, despite the fact that Canada's crude oil output is the amount of domestic demand.
-
Jinling Petrochemical's total nitrogen oxide emissions reduced by 40% year-on-year
Time of Update: 2021-08-28
In recent years, the company has invested heavily in the implementation of more than 300 environmental protection treatment and energy-saving renovation projects, and the main pollutant emissions have been reduced by about 90%.
-
The construction of the pipeline gallery of the Hainan Refining and Chemical Ethylene Plant by the Fourth Construction is progressing in an orderly manner
Time of Update: 2021-08-28
At present, the steel structure installation tasks of 590 pipe gallery in hot zone and 490 pipe gallery in cold zone of Hainan Refining & Chemical Ethylene Project are effectively implemented as planned.
Hainan Refining & Chemical Ethylene Project 590 pipe gallery in hot zone of ethylene plant under construction has steel structure installed.
-
Nanyang Nenghua develops special wax for new environmental protection materials
Time of Update: 2021-08-27
On the morning of August 9th, Nanyang Nenghua developed and produced special waxes for environmental protection materials that meet the latest EU environmental protection requirements according to customer requirements.
Nanyang Nenghua firmly seizes this opportunity and actively develops environmentally friendly special wax products to meet the domestic market demand .