-
Maoming Petrochemical optimizes tank area traps to achieve steam saving goals
Time of Update: 2021-08-10
China Petrochemical News Network reported in June 2021, the Maoming Petrochemical Refining Division's storage and transportation workshop optimized and rectified the tank area heating line traps, reducing the direct steam loss of the heating line, saving 0.
-
Shengli Technical Inspection Center promotes production problems to be unveiled
Time of Update: 2021-08-10
This year, for the first time, the labor union of the center launched the first-line production problem at the center level and the oilfield level together to unveil the list.
-
Jianghan Petroleum Engineering's first battle speeds up!
Time of Update: 2021-08-10
Recently, during the drilling and construction of Anye 2-3HF well, Jianghan Petroleum Engineering Shale Gas Extraction Technology Service Company applied self-developed oil-based drilling fluid to increase the speed by 12% with the average ROP of three openings.
-
Shanghai Petrochemical uses new technology to solve the problem of bolt corrosion protection
Time of Update: 2021-08-10
6 cooling tower fan, which can effectively solve the problem of equipment fixing in humid environments.
6 cooling tower is humid, it is easy to cause corrosion and rust of equipment fixing bolts .
-
Ten-built Gulei ethylene cracking furnace successfully completed the oven
Time of Update: 2021-08-10
The overall modular construction of the cracking furnace has become a "new engine" and "booster" for accelerating the construction of the entire ethylene plant project .
-
Jingmen Petrochemical's stepless regulation system has achieved remarkable results in energy saving and consumption reduction
Time of Update: 2021-08-10
China Petrochemical News Network reported recently that the newly-added gas volume stepless adjustment system of the second residue hydrogenation unit of the Jingmen Petrochemical Refining Department replaced the traditional bypass return gas volume adjustment method to save energy and reduce consumption .
-
Anqing Petrochemical's first achievement won the first prize of the national association
Time of Update: 2021-08-09
China Petrochemical News Network recently, China Equipment Management Association issued the 2021 Petroleum and Chemical Industry Equipment Management and Technology Innovation Achievement Award Certificate, Anqing Petrochemical "Petrochemical Wastewater Cyanide and Sulfide Complete Testing Equipment and Technology Application" won the first prize of innovation achievement .
-
Shengli Oilfield's fast retractable packer rubber cylinder obtained invention patent
Time of Update: 2021-08-09
Sinopec News Network reported recently that "a fast-retracting expansion packer rubber cartridge" declared by the Shengli Oilfield Petroleum Engineering Technology Research Institute shallow sea was authorized by the national invention patent .
-
Jingmen Petrochemical Oily Wastewater Visualization Transformation Project Phase I
Time of Update: 2021-08-09
The first phase of the project uses the existing public engineering system and auxiliary production facilities to change the underground oily sewage pipeline of the whole plant to pipe piers or erected pipes, and divide the oily sewage from the plant area (installation area and tank area) into the collection pool.
-
The thermal processing plant of the Fourth Petrochemical Machinery Company adjusts work and rest to fight high temperatures
Time of Update: 2021-08-09
m. , Zhou Bo, an employee of the copper and aluminum group of the thermal processing plant of the Petrochemical Machinery Fourth Machinery Company, had already arrived at the workshop early and completed the inspection of the intermediate frequency furnace as usual.
-
Yangzi Petrochemical's plastic repackaging product specification uses QR codes
Time of Update: 2021-08-09
In May of this year, in accordance with the requirements of Sinopec’s chemical product QR code application specifications, the Quality Inspection Center of Yangzi Company required the implementation of QR code application on the plastic product packaging line of the solid product operation area of the storage and transportation plant.
-
The adjustment and treatment effect of Yun 11 block in Zhongyuan Oilfield is significant
Time of Update: 2021-08-09
Up to now, the cumulative oil production in the block stage has increased by 6,324 tons, and the recovery rate has reached 42.
-
Foreign media: Saudi Arabia and UAE reached a compromise on oil production increase policy
Time of Update: 2021-08-09
Saudi Arabia proposed a small increase in production plan, advocating that OPEC members increase their daily output by 400,000 barrels from August to December; at the same time, it hopes to extend the current production reduction agreement until the end of 2022 .
-
Zhong'an United Polyethylene New Product M2320 was successfully developed
Time of Update: 2021-08-09
Based on the "high-end and differentiated" product route, Zhongan United actively seeks to produce new polyethylene products with strong profitability, opens up new product applications, and avoids low-price competition in the general-purpose membrane material market .
-
The first phase of the construction of the Tianjin LNG Phase II receiving station was well received
Time of Update: 2021-08-09
The inspection team of Tianjin Bohai Center Quality Supervision Station fully affirmed the rigorous and meticulous work attitude of the employees of the Fourth Construction Second Engineering Company, and praised the project department for continuously strengthening hidden danger investigation and rectification, and continuously strengthening quality education and training and technical disclosure.
-
The Geophysical Prospecting Branch of Shanghai Bureau won the bid for the South Korean drilling project
Time of Update: 2021-08-09
Sinopec News Network reported on June 25 that the Geophysical Prospecting Branch of the Shanghai Bureau won the bid for the South Korean drilling project.
The winning of the bid is a breakthrough for the Shanghai Bureau in the South Korean drilling market.
-
Ten Construction Efficiently Promotes the Construction of Weifang High-end Polypropylene Project
Time of Update: 2021-08-09
Since winning the project bid, Shijian Company quickly established a project organization, actively communicated and coordinated with the owner, supervision, design and other units, and optimized and perfected 12 professional construction organization plans including civil engineering, underground pipe network, steel structure, process pipeline, and equipment.
-
The Puguang Gas Field does a good job of ensuring production safety during the flood season
Time of Update: 2021-08-09
The plant's grassroots units carried out flood prevention and control drills layer by layer, focusing on on-site disposal drills such as emergency injection stop and equipment transfer, effectively preventing oil and gas pipeline safety and environmental accidents caused by geological disasters, and ensuring the safe and stable operation of gas fields .
-
Maoming Petrochemical's product oil quality sampling inspections are all qualified
Time of Update: 2021-08-09
Recently, Maoming Petrochemical received a product oil sampling inspection quality report feedback from the National Fuel Oil Quality Supervision and Inspection Center.
-
Ten construction Sino-Korea petrochemical project job training to solve construction problems
Time of Update: 2021-08-09
Since the start of the Sino-Korea Petrochemical Ethylene De-bottleneck Renovation Project, more than 100 participating employees in the project department have obtained 9 professional fields through "post training" activities in engineering technology, safety, quality, material supply, operating budget, and skills operation.