-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
-
Cosmetic Ingredient
- Water Treatment Chemical
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
Sinopec News Network reported recently that the first phase of the oily wastewater visualization transformation project of Jingmen Petrochemical was completed, adding more impetus to the green development of the company
.
The first phase of the project uses the existing public engineering system and auxiliary production facilities to change the underground oily sewage pipeline of the whole plant to pipe piers or erected pipes, and divide the oily sewage from the plant area (installation area and tank area) into the collection pool.
Collected, and then lifted to the sewage treatment plant through the lifting pump
.
Relying on the DCS of the existing device for real-time control, complete system functions such as data collection, information processing, process control, and security alarms
After the first phase of the project is put into use, the underground pipeline can be lifted to the ground to reduce the pollution of the groundwater due to the leakage of the pipeline and the inspection well.
The pipeline is open for inspection and maintenance
.
The area flow meter can monitor the regional sewage in real time, realize source control; reduce the risk of odor leakage in the sewage system, and realize segmental control
In the early stage, due to the use of existing systems and facilities for the transformation of the project, there was a greater construction safety risk.
(Jiang Xiangli)