-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
-
Cosmetic Ingredient
- Water Treatment Chemical
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
According to the latest output report of Baling Petrochemical's epoxy resin plant, in June, the company's epoxy resin output exceeded 10,000 tons for the first time, a year-on-year increase of 13.
2%
.
Among them, the output of the o-cresol unit increased by 77% year-on-year, and the output of the first unit of liquid resin increased by 46% year-on-year.
In this year, in order to further increase the production capacity of epoxy resin, Baling Petrochemical has carried out work in terms of safety, production and cost reduction and efficiency enhancement based on actual production conditions, and strictly implemented various management systems to ensure that the equipment increases production and consumption
.
Baling Petrochemical conscientiously implements the "General Manager No.
2" "Five Checks and Five Strict" requirements of the group company, combined with the actual situation of the resin plant, strictly implements the "ten to five non-receiving" system, and requires employees to carefully study and abide by the safe operating procedures
.
Carry out one-to-one training on the use of emergency equipment, organize and carry out emergency and anti-violation drills for different positions, strengthen safety inspections, prevent minor failures, pay close attention to implementation, eliminate unsafe factors, prevent various accidents, and lay a safe foundation for stable production
"Which process takes the longest time, optimize which process
.
" Baling Petrochemical resin plant implements a contract system, and each plant leader contracts a set of equipment
In order to stimulate the enthusiasm of employees to increase production and reduce consumption, the company’s o-cresol device carried out ranking labor competitions such as the number of packaging, batches of materials, batches of waste polymers, and operating procedures according to the characteristics of the posts.
More productive, more rewarding"
.
They also accurately manage the process time, especially for key positions such as phenolic feeding, and achieve regular and quantitative measurements to ensure daily batch operation, so as to achieve high and stable production of the device
(Xiao Xiong, Li Miao, Xu Liangliang)