-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
-
Cosmetic Ingredient
- Water Treatment Chemical
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
On April 20, the styrene unit of the Baling Petrochemical Refining Department was successfully started after a partial emergency repair, and the qualified styrene was produced on the same day to provide raw materials for the production units of the downstream rubber department
In the first quarter, the styrene plant of the department adhered to both epidemic prevention and control and stable operation, maintaining a daily output of about 300 tons of styrene, producing a total of 24,500 tons of high-quality styrene
On April 13, the device was shut down for repairs
During the emergency repair period, the Refinery Department strengthened scheduling, and the styrene unit dispatched 5 key team members to participate in coordination and operation monitoring.
In order to ensure the stable supply of styrene raw materials required for the production of the rubber department after the shutdown of the plant, the oil refining department has actively cooperated with the company to purchase styrene raw materials from the beginning of April, and independently designed a temporary unloading process to safely unload the purchased raw materials to styrene.