echemi logo
Product
  • Product
  • Supplier
  • Inquiry
    Home > Chemicals Industry > Chemical Technology > Dechang Wind Power Equipment Manufacturing Demonstration Base: Contribute to the development of new energy in Sichuan

    Dechang Wind Power Equipment Manufacturing Demonstration Base: Contribute to the development of new energy in Sichuan

    • Last Update: 2022-11-22
    • Source: Internet
    • Author: User
    Search more information of high quality chemicals, good prices and reliable suppliers, visit www.echemi.com

    On September 3, some online media from the central government and Yunnan, Guizhou, Sichuan and Chongqing provinces and cities entered the wind power equipment manufacturing demonstration base
    of Liangshan Yi Autonomous Prefecture (Dechang) in Sichuan Province.
    The base is located in Dechang Concentration Zone, Panxi Strategic Resources Innovation and Development Pilot Zone, which will provide equipment support for Liangshan Prefecture to build a 10 million kilowatt wind power base and make further contributions
    to the development of new energy in Sichuan Province.

    It is understood that Liangshan (Dechang) wind power equipment manufacturing demonstration base, with the care and help of the state party committee and the state government, broke the administrative barriers, and the state investment and the county state-owned assets company cooperated to establish "Liangshan Dechang Industrial Concentration Zone Construction Investment Co.
    , Ltd.
    ", planning to invest 800 million yuan to build a 200,000 square meters of small and medium-sized enterprises incubation base, and now 80,000 square meters of standardized factory buildings
    have been built.

    The base started planning and construction in June 2015, and settled in 7 projects such as wind turbine blade main engine manufacturing, tower equipment manufacturing, cabin cover, glass fiber cloth, supporting production services and logistics, operation and maintenance support, and test site in only one year, creating "East Gas Speed", "Liangshan Speed" and "Dechang Speed", basically forming a wind power equipment manufacturing industrial cluster integrating R&D, manufacturing, certification, testing, training, parts supply, and operation and maintenance services, with an annual output value of more than 5 billion yuan.
    It has laid a solid foundation
    for Liangshan Prefecture to build a 10 million kilowatt wind power industry.

    Wind turbine blades and host projects
    .
    Dongfang Electric Liangshan Wind Power Equipment Manufacturing Demonstration Base covers an area of more than 500 mu, with an investment of 600 million yuan, planning to build wind power blade manufacturing plants, wind power host manufacturing plants, R&D centers, warehouses and storage yards and other ancillary production and living facilities
    .
    After reaching production, it has an annual output of 1 million kilowatts of 2.
    0MW and above doubly-fed and direct drive wind power host, an annual output of 1 million kilowatts of wind turbine blades, an annual output value of nearly 2 billion yuan, an annual profit and tax of about 300 million yuan, and absorbs more than 100 local surplus labor
    .
    The first phase of the wind turbine blade project started construction in July 2015 and was completed and put into operation at the end of November, the main engine manufacturing project was completed and put into operation in March 2016, and the second phase of the wind turbine blade project was completed and put into operation
    in July 2016.

    Wind turbine tower equipment manufacturing project
    .
    The wind power tower equipment manufacturing project of China Water Fourth Bureau covers an area of about 230 acres, with an investment of 300 million yuan, with an annual output of 400 sets of wind turbine towers, of which the first phase of the project covers an area of about 150 acres, with an investment of about 200 million yuan, an annual output value of about 300 million yuan, and an annual profit and tax of about 35 million yuan; The second phase of the project covers an area of 80 acres, supporting auxiliary production facilities
    such as large-scale logistics, warehousing and spare parts centers.
    The project started construction in November 2015 and was completed and put into operation
    in April 2016.

    Wind turbine cabin cover supporting production project
    .
    Sichuan Dongshu New Materials Co.
    , Ltd.
    cabin cover supporting production project covers an area of about 25 acres, with an investment of 80 million yuan, with an annual production capacity of 150-300 sets of cabin covers, an annual output value of 60 million yuan, and an annual profit and tax of 5 million yuan
    .
    At present, the construction of production and living facilities such as standardized workshops, yards, and production auxiliary rooms is being carried out, and it is expected to be completed and put into operation
    by the end of September 2016.

    Glass fiber seam knitting manufacturing project
    .
    The glass fiber seam weave manufacturing project of Aerospace Long March Ruite Technology Co.
    , Ltd.
    covers an area of about 16 acres, with an investment of 100 million yuan, with an annual output of 10,000 tons of glass fiber seam weave production capacity, an annual output value of 100 million yuan, and an annual profit and tax of more than 10 million yuan
    .
    At present, the construction of production and living facilities such as standardized plant buildings and production auxiliary rooms is being carried out, and it is expected to be completed and put into operation
    by the end of September 2016.

    Wind power supporting production services and logistics projects
    .
    Panxi Logistics Center jointly built by Dechang Hongda Logistics Company and Liangshan New Energy Equipment Company of China Water Fourth Bureau, covering an area of about 50 acres and investing 80 million yuan, plans to build a modern comprehensive logistics park integrating large-scale warehousing, large-scale transportation, loading and distribution, e-commerce and express distribution, etc.
    , with an annual output value of up to 100 million yuan and an annual profit and tax of about 10 million yuan
    .
    The site has been determined, and the relevant procedures are being improved and preparations are being made
    .

    O&M support service items
    .
    It is planned to be led by Xichang Electric Power Company, Jiangsu Wuxi Perception Group, State Investment Corporation and Dongqi Group will set up an operation and maintenance guarantee service company to provide operation, maintenance and guarantee services
    for the development of wind power industry in Liangshan and even the entire southwest region.
    Currently, a company formation plan
    is being prepared.

    Wind power test site and fuel cell functional system, vanadium flow battery energy storage system test and promotion project
    .
    Dongfang Electric plans to build a wind power test site at Dechang for the development and testing optimization of new wind turbines
    .
    At the same time, Dongfang Electric Chengdu Qingneng Technology Co.
    , Ltd.
    plans to test and promote fuel cell and all-vanadium flow energy storage battery products in Dechang Wind Farm, Dongfang Electric Wind Power Experimental Field, and Yonglang Changsheng Radian Photovoltaic Modern Agricultural Science and Technology Industrial Park, and is now preparing to start related work
    .

    On September 3, some online media from the central government and Yunnan, Guizhou, Sichuan and Chongqing provinces and cities entered the wind power equipment manufacturing demonstration base
    of Liangshan Yi Autonomous Prefecture (Dechang) in Sichuan Province.
    The base is located in Dechang Concentration Zone, Panxi Strategic Resources Innovation and Development Pilot Zone, which will provide equipment support for Liangshan Prefecture to build a 10 million kilowatt wind power base and make further contributions
    to the development of new energy in Sichuan Province.

    Wind power

    It is understood that Liangshan (Dechang) wind power equipment manufacturing demonstration base, with the care and help of the state party committee and the state government, broke the administrative barriers, and the state investment and the county state-owned assets company cooperated to establish "Liangshan Dechang Industrial Concentration Zone Construction Investment Co.
    , Ltd.
    ", planning to invest 800 million yuan to build a 200,000 square meters of small and medium-sized enterprises incubation base, and now 80,000 square meters of standardized factory buildings
    have been built.

    The base started planning and construction in June 2015, and settled in 7 projects such as wind turbine blade main engine manufacturing, tower equipment manufacturing, cabin cover, glass fiber cloth, supporting production services and logistics, operation and maintenance support, and test site in only one year, creating "East Gas Speed", "Liangshan Speed" and "Dechang Speed", basically forming a wind power equipment manufacturing industrial cluster integrating R&D, manufacturing, certification, testing, training, parts supply, and operation and maintenance services, with an annual output value of more than 5 billion yuan.
    It has laid a solid foundation
    for Liangshan Prefecture to build a 10 million kilowatt wind power industry.

    Wind turbine blades and host projects
    .
    Dongfang Electric Liangshan Wind Power Equipment Manufacturing Demonstration Base covers an area of more than 500 mu, with an investment of 600 million yuan, planning to build wind power blade manufacturing plants, wind power host manufacturing plants, R&D centers, warehouses and storage yards and other ancillary production and living facilities
    .
    After reaching production, it has an annual output of 1 million kilowatts of 2.
    0MW and above doubly-fed and direct drive wind power host, an annual output of 1 million kilowatts of wind turbine blades, an annual output value of nearly 2 billion yuan, an annual profit and tax of about 300 million yuan, and absorbs more than 100 local surplus labor
    .
    The first phase of the wind turbine blade project started construction in July 2015 and was completed and put into operation at the end of November, the main engine manufacturing project was completed and put into operation in March 2016, and the second phase of the wind turbine blade project was completed and put into operation
    in July 2016.

    Wind turbine tower equipment manufacturing project
    .
    The wind power tower equipment manufacturing project of China Water Fourth Bureau covers an area of about 230 acres, with an investment of 300 million yuan, with an annual output of 400 sets of wind turbine towers, of which the first phase of the project covers an area of about 150 acres, with an investment of about 200 million yuan, an annual output value of about 300 million yuan, and an annual profit and tax of about 35 million yuan; The second phase of the project covers an area of 80 acres, supporting auxiliary production facilities
    such as large-scale logistics, warehousing and spare parts centers.
    The project started construction in November 2015 and was completed and put into operation
    in April 2016.

    Wind turbine cabin cover supporting production project
    .
    Sichuan Dongshu New Materials Co.
    , Ltd.
    cabin cover supporting production project covers an area of about 25 acres, with an investment of 80 million yuan, with an annual production capacity of 150-300 sets of cabin covers, an annual output value of 60 million yuan, and an annual profit and tax of 5 million yuan
    .
    At present, the construction of production and living facilities such as standardized workshops, yards, and production auxiliary rooms is being carried out, and it is expected to be completed and put into operation
    by the end of September 2016.

    Glass fiber seam knitting manufacturing project
    .
    The glass fiber seam weave manufacturing project of Aerospace Long March Ruite Technology Co.
    , Ltd.
    covers an area of about 16 acres, with an investment of 100 million yuan, with an annual output of 10,000 tons of glass fiber seam weave production capacity, an annual output value of 100 million yuan, and an annual profit and tax of more than 10 million yuan
    .
    At present, the construction of production and living facilities such as standardized plant buildings and production auxiliary rooms is being carried out, and it is expected to be completed and put into operation
    by the end of September 2016.

    Wind power supporting production services and logistics projects
    .
    Panxi Logistics Center jointly built by Dechang Hongda Logistics Company and Liangshan New Energy Equipment Company of China Water Fourth Bureau, covering an area of about 50 acres and investing 80 million yuan, plans to build a modern comprehensive logistics park integrating large-scale warehousing, large-scale transportation, loading and distribution, e-commerce and express distribution, etc.
    , with an annual output value of up to 100 million yuan and an annual profit and tax of about 10 million yuan
    .
    The site has been determined, and the relevant procedures are being improved and preparations are being made
    .

    O&M support service items
    .
    It is planned to be led by Xichang Electric Power Company, Jiangsu Wuxi Perception Group, State Investment Corporation and Dongqi Group will set up an operation and maintenance guarantee service company to provide operation, maintenance and guarantee services
    for the development of wind power industry in Liangshan and even the entire southwest region.
    Currently, a company formation plan
    is being prepared.

    Wind power test site and fuel cell functional system, vanadium flow battery energy storage system test and promotion project
    .
    Dongfang Electric plans to build a wind power test site at Dechang for the development and testing optimization of new wind turbines
    .
    At the same time, Dongfang Electric Chengdu Qingneng Technology Co.
    , Ltd.
    plans to test and promote fuel cell and all-vanadium flow energy storage battery products in Dechang Wind Farm, Dongfang Electric Wind Power Experimental Field, and Yonglang Changsheng Radian Photovoltaic Modern Agricultural Science and Technology Industrial Park, and is now preparing to start related work
    .

    This article is an English version of an article which is originally in the Chinese language on echemi.com and is provided for information purposes only. This website makes no representation or warranty of any kind, either expressed or implied, as to the accuracy, completeness ownership or reliability of the article or any translations thereof. If you have any concerns or complaints relating to the article, please send an email, providing a detailed description of the concern or complaint, to service@echemi.com. A staff member will contact you within 5 working days. Once verified, infringing content will be removed immediately.

    Contact Us

    The source of this page with content of products and services is from Internet, which doesn't represent ECHEMI's opinion. If you have any queries, please write to service@echemi.com. It will be replied within 5 days.

    Moreover, if you find any instances of plagiarism from the page, please send email to service@echemi.com with relevant evidence.