echemi logo
Product
  • Product
  • Supplier
  • Inquiry
    Home > Chemicals Industry > China Chemical > Domestic EVA project progress inventory

    Domestic EVA project progress inventory

    • Last Update: 2022-11-26
    • Source: Internet
    • Author: User
    Search more information of high quality chemicals, good prices and reliable suppliers, visit www.echemi.com

    Driven by market demand such as photovoltaics, the domestic EVA industry has ushered in rapid development
    in recent years.
    Since 2022, a number of domestic EVA projects have been promoted, on the one hand, the domestic EVA leader represented by Oriental Shenghong has launched photovoltaic grade EVA projects to further consolidate the low level of domestic leaders, while expanding the production capacity of EVA photovoltaic materials to alleviate the shortage of such high-end EVA products in China; At the same time, enterprises such as Sinochem Quanzhou and Zhongke Refining and Chemical have expanded their capacity to increase domestic EVA supply; On the other hand, there are also "new players" such as Baihong Chemical and Ningxia Coal Industry entering the game, striving to get a share in
    this market.
    Let's review the recent progress of
    the domestic EVA project.

    Sinochem Quanzhou expands capacity to 140,000 tons

    On November 2, Sinochem Quanzhou's 100,000 tons/year EVA plant expanded to 140,000 tons/year for the construction project environmental impact report was published
    .

    According to reports, the 200,000 tons/year EVA unit previously approved by Sinochem Quanzhou was completed in July 2021 with a phase of 100,000 tons/year, and passed the independent completion and environmental protection acceptance in June 2022, and the other 100,000 tons/year EVA unit was slowly built, and is currently undergoing preliminary procurement work
    .

    According to the market development, Sinochem Quanzhou introduces advanced technology related to international EVA equipment, and plans to expand the existing 100,000 tons/year EVA plant, that is, add a section of tubular reactor after the existing compound reactor, and improve and optimize the existing plant system, after the transformation, the production capacity can be expanded to 140,000 tons/year
    .

    Gulei refining and chemical integration project EVA equipment in the middle of the handover

    At the end of October, the EVA unit of Gulei refining and chemical integration project was successfully handed over, EVA unit is one of the nine main units of Gulei refining and chemical integration project, the unit uses ethylene as the production raw material, will produce 300,000 tons of ethylene-vinyl acetate resin per year, can effectively make up for the gap
    in the domestic EVA market.

    Baihong Chemical's 350,000-ton EVA and other environmental impact assessments

    On October 20, Baihong Chemical New Materials Project conducted an environmental impact assessment
    .
    It is reported that the total investment of the project is 13.
    8 billion yuan, the project construction site is located in the Nanshan area of Quangang Petrochemical Park, Quanzhou City, the project covers an area of about 69.
    38 hectares, and is planned to complete trial production at the end of December 2024, mainly building 300,000 tons/year butane pretreatment, 150,000 tons/year n-butane maleic anhydride, 200,000 tons/year CO2 recovery, 200,000 tons/year vinyl carbonate, 120,000 tons/year methyl ethyl carbonate, 10,000 tons/year acetaldehyde recovery, 45,000 standard tons/hour natural gas partial oxidation, 350,000 tons/year acetic acid , 100,000 tons/year vinyl acetate, 150,000 tons/year EVA device (kettle type), 200,000 tons/year EVA device (tubular type), 250,000 tons/year butane pretreatment (including 100,000 tons/year isobutane regular structure), 150,000 tons/year n-butane to maleic anhydride, 150,000 tons/year BDO, 100,000 tons/year succinic acid, 50,000 tons/year PBS plant, 46,000 tons/year polytetrahydrofuran device, 100,000 tons/year propylene carbonate, etc
    .

    Oriental Shenghong's 200,000-ton photovoltaic grade EVA environmental assessment was approved

    On October 13, Jiangsu Hongjing New Materials 200,000 tons of photovoltaic-grade EVA project, public works and auxiliary facilities project environmental impact assessment was approved
    .
    Among them, the EVA project, with an investment of 2.
    585 billion yuan, is scheduled to start production in October 2024, and it is planned to use the Basell Lupotech T tubular process
    .

    On September 7th, the groundbreaking ceremony of Oriental Shenghong Chemical New Material Project was held
    in Lianyungang Petrochemical Base.
    Shenghong Chemical New Material Project is mainly based on new energy materials, and plans to build 700,000 tons/year EVA, PO/SM and polyol, high-end polyolefin and other projects
    .
    After the completion of the project, the production capacity of Oriental Shenghong EVA will reach 1 million tons/year, of which the global market for photovoltaic grade EVA will account for more than 40%, ranking first
    in the world.

    2.
    37
    billion! Ningxia Coal Industry 100,000 tons EVA project started

    On September 27, the National Energy Group held the second batch of key projects to start the groundbreaking ceremony, and the 100,000 tons/year EVA project of Ningxia Coal Industry Company was officially started as one of the projects
    .

    The total investment of the project is estimated to be 2.
    37 billion yuan, using the ethylene and public works of the second phase of olefin, to produce EVA products
    covering photovoltaic adhesive film, cable material, foamed shoe material, hot melt adhesive, agricultural film and other fields.
    After the implementation of the project, the demand for ethylene will increase, which can increase the amount of naphtha processing, which can not only solve the problem of imbalance of ethylene plant in the second phase of the olefin project, but also solve the problem of load imbalance of each process device, and at the same time realize the differentiation and high-end of polyethylene products, and promote the in-depth development of
    polyolefin industry.

    It is reported that the EVA project is scheduled to be put into operation in December 2025 and is planned to use ExxonMobil's kettle process
    .
    The main raw materials are ethylene from the second phase of the olefin project and purchased vinyl acetate, and the auxiliary materials are mainly isobutene, n-butane, isoparaffin solvent oil and isododecane solvent.

    Production of 9 grades of EVA products
    .

    Guangxi Huayi Energy Chemical EVA Project promoted the bidding work

    On September 19, Guangxi Huayi Energy Chemical Methanol to olefin and downstream deep processing integration project carried out the preparation of the process package of vinyl acetate plant and the announcement of the basic design evaluation results, and at the same time launched the bidding announcement
    of the basic design of EVA plant.

    It is reported that the project is located in Guangxi Qinzhou Petrochemical Industrial Park, with a total investment of 11.
    8 billion yuan, mainly building 1 million tons/year methanol to olefin plant, 300,000 tons/year vinyl acetate plant, 250,000 tons/year tubular EVA plant, 100,000 tons/year kettle EVA plant, etc
    .

    The EVA/LDPE plant of the Yulong Island Refining and Chemical Integration Project officially started

    On September 21, the 2#500,000 tons/year high-pressure polyethylene (EVA/LDPE) plant of Yulong Island refining and chemical integration project officially started, and Shandong Yulong Petrochemical Co.
    , Ltd.
    , Tianjin Chenda Engineering Supervision Co.
    , Ltd.
    and relevant personnel of the project jointly attended the groundbreaking ceremony
    .

    The latest progress of Tianli High-tech Petrochemical's 200,000 tons/year EVA project

    On September 16, Tianli High-tech Petrochemical's 200,000 tons/year EVA project was successfully put into operation and started up at one time, producing high-pressure polyethylene products, laying a solid foundation
    for the subsequent production of high-quality EVA products by the plant.

    It is reported that the EVA project belongs to the first EVA unit
    of PetroChina.
    With a total investment of 2.
    462 billion yuan, the annual output value after putting into operation exceeds 3 billion yuan, which can alleviate the high import dependence of EVA high-end products in China and help the supply of
    new energy materials.
    The project started construction on May 10, 2020, and achieved a high level of comprehensive CCCC on June 30, 2022, with a construction period of 25 months
    .
    Using Basell's LUPOTECH T tubular reactor technology
    .

    Juzhengyuan mounted EVA device

    On September 2, the environmental impact report of Juzhengyuan (Jieyang) new material base project was accepted and publicized
    .
    The total investment of the project is about 15.
    6 billion yuan.

    It mainly constructs 600,000 tons/year propane dehydrogenation plant, 300,000 tons/year polypropylene plant, 160,000 tons/year acrylic acid and 200,000 tons/year butyl acrylate plant, 300,000 tons/year butanol plant, 150,000 tons/year EVA plant, 600,000 tons/year acetic acid and ester plant, 300,000 tons/year vinyl acetate plant, etc
    .

    1.
    94
    billion, Zhongke Refining and Chemical Corporation built the No.
    2 EVA project

    On August 29, the environmental impact report of the new EVA project of Zhongke Refining and Chemical Corporation was publicized
    before approval.

    It is reported that the total investment of the project is 1.
    94 billion yuan, and one new set of 100,000 tons/year EVA unit is built, and the construction period is planned to be 24 months
    .
    The main products are EVA (ethylene-vinyl acetate copolymer) with different VA content, and there are a total of 12 product grades, all of which are sold
    as commodities.
    The main raw materials ethylene and propylene are directly transported by the ethylene plant of Zhongke (Guangdong) Refining and Chemical Co.
    , Ltd.
    , and vinyl acetate is provided
    by Sinopec.
    The unit uses Lyondellbasell's autoclave polymerization process technology
    .


    This article is an English version of an article which is originally in the Chinese language on echemi.com and is provided for information purposes only. This website makes no representation or warranty of any kind, either expressed or implied, as to the accuracy, completeness ownership or reliability of the article or any translations thereof. If you have any concerns or complaints relating to the article, please send an email, providing a detailed description of the concern or complaint, to service@echemi.com. A staff member will contact you within 5 working days. Once verified, infringing content will be removed immediately.

    Contact Us

    The source of this page with content of products and services is from Internet, which doesn't represent ECHEMI's opinion. If you have any queries, please write to service@echemi.com. It will be replied within 5 days.

    Moreover, if you find any instances of plagiarism from the page, please send email to service@echemi.com with relevant evidence.