-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
- Cosmetic Ingredient
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
Recently, the comprehensive utilization project of propane resources of Donghua Energy (Ningbo) New Materials Co.
, Ltd.
(Phase II) and the supporting reservoir area and the third phase (I) project of comprehensive utilization of alkane resources in Ningbo, which is in charge of engineering design and management by Hualu Company, have opened up the whole process.
, each device has a successful feeding and stable operation
.
The project is located in Daxie Development Zone, Ningbo City, Zhejiang Province.
It is a second-phase project based on the first-phase comprehensive utilization of propane resources, which was completed and put into operation in November 2016
.
In the face of tight construction schedule, heavy tasks and complex construction conditions, the Ningbo project team of Hualu Company made overall arrangements and careful deployment, actively overcame difficulties, continuously optimized the design, and scientifically organized and managed, and finally effectively ensured that the project was successfully fed in one time and produced qualified products.
product
.