-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
- Cosmetic Ingredient
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
On May 21st, the C281 high-pressure crude styrene tower of the Gulei Refinery and Chemical Project, which was constructed by the Tenth Construction Company of the Refining and Chemical Engineering Group, was turned on; on May 18, the low-pressure crude styrene tower C202 was turned on
.
C281 tower, diameter 5.
3m, height 77.
8m, net weight 341 tons; C-202 tower, equipment diameter 6.
4m, height 81.
9m, net weight 460 tons
.
At 9:17 a.
m.
on May 21, following the successful hoisting of the C-202 tower, the 4000-ton crawler crane and the 400-ton crawler crane "joined hands" again to hoist the C281 high-pressure crude styrene tower, and the two cranes were hooked separately.
At the head and tail of the equipment, slowly lift the equipment from the horizontal to the upright state
.
The time is tight, the task is heavy, and the hoisting node is imminent.
The professional construction of INESA has entered the "5+2" and "white+black" competition mode
.
On the evening of May 21, C202 and C281 lit up the night sky of the Gulei refining and chemical project, and also ignited the confidence and determination of Shijian Company to work hard to build Gulei
.