echemi logo
Product
  • Product
  • Supplier
  • Inquiry
    Home > Chemicals Industry > Chemical Technology > Industrial Ethylene Liquid and Gas Sampling Method (1)

    Industrial Ethylene Liquid and Gas Sampling Method (1)

    • Last Update: 2021-12-13
    • Source: Internet
    • Author: User
    Search more information of high quality chemicals, good prices and reliable suppliers, visit www.echemi.com

    1 Subject content and scope of application

    This standard specifies the methods and relevant precautions for taking representative samples of liquid ethylene and gaseous ethylene stored at low temperatures


    The remaining sample is given illustrating the exhaust system in Appendix A


    2 Reference standards

    GB 7715 Industrial Ethylene

    3 Sampling method of liquid ethylene

    3.


    Ethylene should be stored and transported in liquid form at low temperatures


    The critical temperature of ethylene is 9.


    Operators should use protective gloves to prevent low temperature burns, and they should also wear sun goggles


    Ethylene is extremely flammable, and the operation site must be well ventilated to avoid the formation of an explosive atmosphere, especially during the washing operation


    The sampler should be grounded


    3.


    The liquid sampling device is shown in Figure 1


    Figure 1 Liquid ethylene sampling device

    3.


    Use double-valve sampling cylinders with adjustment tubes (see Figure 1)


    3.


    The inner diameter of 4mm, a length of not more than 2m stainless steel pipe and a control valve P ', Q composed of the discharge valve


    3.


    Flush the sampler (3.


    Close the sampler inlet valve A and outlet valve R, open valves P and P', and slowly open valve Q to flush the sampling pipeline
    .
    When a liquid sample appears at the end of the vent tube, the valve Q is closed
    .

    Open valve A and valve B of the sampler.
    After a small amount of sample enters the sampler, close valve B and valve A, and then open valve B to discharge all the samples
    .
    Repeat this sampler flushing operation not less than three times
    .

    After the sampler is flushed, close valve and, then open valve A and valve R in turn to start sampling
    .

    When the liquid sample present in the end of the vent pipe valve B, immediately close the valve A, valve B closes
    .

    After the sampling operation is completed, close valve P'and valve P, open valve Q, and remove the sampler after releasing the pressure
    .

     

     

    This article is an English version of an article which is originally in the Chinese language on echemi.com and is provided for information purposes only. This website makes no representation or warranty of any kind, either expressed or implied, as to the accuracy, completeness ownership or reliability of the article or any translations thereof. If you have any concerns or complaints relating to the article, please send an email, providing a detailed description of the concern or complaint, to service@echemi.com. A staff member will contact you within 5 working days. Once verified, infringing content will be removed immediately.

    Contact Us

    The source of this page with content of products and services is from Internet, which doesn't represent ECHEMI's opinion. If you have any queries, please write to service@echemi.com. It will be replied within 5 days.

    Moreover, if you find any instances of plagiarism from the page, please send email to service@echemi.com with relevant evidence.