-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
- Cosmetic Ingredient
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
Sinopec News Network reported recently that Jinling Petrochemical held a material supply fire prevention plan drill.
All the material supply staff accepted a fire alarm escape plan drill and actual fire fighting knowledge to build the cornerstone of summer material supply safety
.
In the "Five Checks and Five Strict" special operations to ensure safety, the company's material installation center found through self-inspection and self-inspection that there are hidden hardware and personnel safety hazards in the fire protection of the office building
.
In order to prevent problems before they happen, the center timely complemented the hardware facilities and held fire drills
During the exercise, after receiving the alarm, the relevant people immediately activated the emergency plan to quickly eliminate the danger, and immediately evacuated nearly 80 employees from the office building to the designated safe area according to the scheduled escape route.
The number of people who arrived and asked for leave was confirmed without casualties
.
At the end of the exercise, professionals from the fire protection detachment commented on the exercise, pointed out the shortcomings in the escape process, and urged the improvement of the emergency plan
.
At the same time, conduct fire-fighting knowledge training, conduct practical operation guidance on site, enhance the safety awareness of all employees, and improve emergency response capabilities
(Chen Pingxuan and Chen Qisheng)