-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
- Cosmetic Ingredient
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
This year, Maoming Petrochemical .
Do everything possible to solve system problems
Do everything possible to solve system problems"Director Xu, today's ethylene output is 3,325 to.
Since the beginning of this year, the cracking gas compressor CB-301 of .
In-depth optimization to increase ethylene production
In-depth optimization to increase ethylene production"The report of the company's selection and optimization project in September:The H-120 convection section is chemically cleaned to reduce the exhaust gas temperature and increase the lo.
In order to increase the output of ethylene, the cracking workshop has tried every means to deeply optimize the system to increase the output of ethylene, so as to truly realize the potential and increase efficien.
Carry out competitions to achieve full participation
Carry out competitions to achieve full participation"Master Liang, the optimization project of "Optimizing the Gasification Effect of Light Hydrocarbon Vaporizers and Increasing the Load" that you submitted won the second place in the advanced individual in the workshop, congratulations!" After seeing the commendation notice, Xiao Li of the team immediately reported to the cracking master operat.
"Old Dong, your night shift's diene output is good, how did you achieve it? Share it quickly, the output award is almost contracted by your shift!" Tan Yubin, the shift leader of the cracking workshop, took over from the shift leader Dong Junfei from the previous shi.
In order to improve the work enthusiasm of the workers in the workshop, the cracking workshop carried out the team's "Small Indicators Excellence", "Red Flag Furnace Competition", "Special Competition for Optimizing Project Evaluation" and "Special Competition for Diene Production Labor", and timely commended and rewarded, mobilized the te.