-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
- Cosmetic Ingredient
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
A few days ago, it was reported from Maoming Petrochemical that the coal-to-hydrogen unit in the refining division operated for 989 days in a safe and long-term cycle, breaking its own operating record again and setting the best level of long-term operation of similar devices in China
.
It is understood that Maoming Petrochemical adheres to standardized management, deepens the investigation and rectification of hidden dangers, and implements more than 20 technical breakthroughs to consolidate the foundation of safe production and ensure long-term operation
.
They intensified the promotion of the finger dictation operation method, and created a "everyone consciously implement the finger dictation operation method to ensure that every operation safety” atmosphere
.
The coal-to-hydrogen ice machine 24K001 is the "heart" of the device
They carried out in-depth investigation and rectification of long-term hidden dangers, carried out the responsibility contracting of equipment divisions, and implemented the operation and maintenance of key units of the equipment
.
Maoming Petrochemical regularly conducts cross-checks on hidden dangers of "low, old and bad" equipment, conducts "A/B/C" ratings item by item, and implements rectification based on priorities
In addition, the daily operation and control of Maoming Petrochemical's solidification plant will improve the quality of inspections as the key to ensuring the safe operation of the plant
.
In response to the problems of inconsistent standards, unclear focus, and low enthusiasm in the daily inspection of teams, the workshop innovatively proposed standardized, warning, and integral inspection management methods, and the quality of team inspections has been significantly improved