echemi logo
Product
  • Product
  • Supplier
  • Inquiry
    Home > Chemicals Industry > Petrochemical News > Northwest Ya Factory tamped the "three preventions" to ensure the smooth operation of the device

    Northwest Ya Factory tamped the "three preventions" to ensure the smooth operation of the device

    • Last Update: 2021-08-10
    • Source: Internet
    • Author: User
    Search more information of high quality chemicals, good prices and reliable suppliers, visit www.echemi.com

    Sinopec News Network News July 12, Zhu Zhiying, an engineer from the QHSE management office of the Northwest Oilfield Yakela Gas Production Plant, strengthened the inspection of key areas and key equipment hidden dangers in each management area during the inspection, and optimized and adjusted the operation of the device through the monitoring data to consolidate the flood prevention Lightning and high temperature protection, to ensure safe and environmentally friendly production of flood protection, lightning protection and high temperature protection
    .


    This is a microcosm of the plant's efforts to consolidate safety in summer


    In the face of rising temperatures and the advent of the rainy season, the plant implemented the requirements of “managing work and managing safety, managing business and managing safety”, combined with typical accident cases, grasping the source, strict supervision, suppressing responsibility, curing disease, and analyzing and judging risk factors , Improve emergency measures to respond to sudden severe weather, carry out comprehensive management in depth, transfer and compact responsibility for safe production, ensure safe and stable operation of production, and resolutely win the battle of safety and environmental protection
    .

    Construct a "doctor + nurse + expert" management model
    .


    The plant eliminates the adverse effects of high temperature in summer on the production of the device, and for the "heat-resistant" equipment physical examination, the equipment is "heatstroke prevention and cooling" from various aspects


    Intensify inspections of the "Trinity"
    .


    The QHSE management room increases the frequency of inspections of key units, carefully measures the temperature of each part of the motor with a thermometer and a vibrometer, carefully records the operating status of the equipment, makes analysis and judgments, analyzes the reasons for the high temperature transfer found in a timely manner, and takes cooling measures.


    Strengthen the control of "high temperature" parts
    .


    Position employees pay close attention to important equipment in high temperature environments, organize professional and technical personnel to clean and maintain air coolers, water coolers, oil coolers and other cold exchange equipment, and evaluate the heat exchange effect; comprehensively screen the cooling of electronic equipment rooms and instrument rooms Equipment, to ensure that the equipment is easy to use without problems


    Comprehensive investigation of flood control and lightning protection infrastructure.


    (Zhu Fangning)

    This article is an English version of an article which is originally in the Chinese language on echemi.com and is provided for information purposes only. This website makes no representation or warranty of any kind, either expressed or implied, as to the accuracy, completeness ownership or reliability of the article or any translations thereof. If you have any concerns or complaints relating to the article, please send an email, providing a detailed description of the concern or complaint, to service@echemi.com. A staff member will contact you within 5 working days. Once verified, infringing content will be removed immediately.

    Contact Us

    The source of this page with content of products and services is from Internet, which doesn't represent ECHEMI's opinion. If you have any queries, please write to service@echemi.com. It will be replied within 5 days.

    Moreover, if you find any instances of plagiarism from the page, please send email to service@echemi.com with relevant evidence.