-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
- Cosmetic Ingredient
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
Sinopec News Network News Recently, the process pipeline installation of the Shandong Weifang 300,000 tons/year high-end polypropylene project undertaken by the Tenth Construction Company of Refining and Chemical Engineering has been fully launched, creating favorable conditions for the project's equipment installation, steel structure and other professional construction to enter the peak stage
It is understood that the total process pipeline construction of the 300,000 tons/year high-end polypropylene project in Weifang is 170,000 inches in diameter, including stainless steel, carbon steel, low temperature steel and other pipeline materials.
In the process of pipeline construction, the project department took the September "Quality Month" as an opportunity to take multiple measures to strengthen the quality control of pipeline welding, and through the implementation of strict construction technology quality clarifications, the quality control awareness of the participating employees was improved
As of September 1, with the hard work of the staff participating in the project department, the process pipeline installation of the 300,000 tons/year high-end polypropylene project in Weifang has exceeded 1,000 inches in diameter, and the qualified rate of pipeline welds has reached 100%.
(Tian Yuanwu)