echemi logo
Product
  • Product
  • Supplier
  • Inquiry
    Home > Chemicals Industry > Petrochemical News > Pressure pipeline installation qualifications, petrochemical enterprises fire spacing settings are divided into several levels?

    Pressure pipeline installation qualifications, petrochemical enterprises fire spacing settings are divided into several levels?

    • Last Update: 2022-10-19
    • Source: Internet
    • Author: User
    Search more information of high quality chemicals, good prices and reliable suppliers, visit www.echemi.com

    The fire spacing settings of petrochemical enterprises are divided into three levels
    .
    Implement the following provisions:

    The pressure pipeline design and installation construction of petrochemical enterprises shall be completed
    by the GC1 or GC2 pressure pipeline design and installation qualification license.

    (1) The fire spacing between petrochemical enterprises and adjacent factories or facilities shall be subject to Table 4.
    1.
    9 and Table 4.
    1.
    10 of the current national standard "Design Fire Protection Standard for Petrochemical Enterprises" GB50160-2008 (2018 edition).

    (2) The fire spacing between the facilities between the process devices shall be implemented in Table 4.
    2.
    12 of the current national standard "Fire Protection Standard for the Design of Petrochemical Enterprises" GB 50160-2008 (2018 edition).

    (3) The fire spacing of each facility in the process device implements the current national standard 4 Petrochemical Enterprise Design Fire Protection Standard" GB 50160-2008 (2018 edition) table 5.
    2.
    1
    .

    Due to the different property losses and social impacts caused by the occurrence of fires and the spread of fires in different individuals, paragraph (1) is larger than the distance specified in paragraph (2) and (2) than that stipulated in paragraph (3), reflecting the layers of fortification and the strengthening of layers of layers
    .

    This article is an English version of an article which is originally in the Chinese language on echemi.com and is provided for information purposes only. This website makes no representation or warranty of any kind, either expressed or implied, as to the accuracy, completeness ownership or reliability of the article or any translations thereof. If you have any concerns or complaints relating to the article, please send an email, providing a detailed description of the concern or complaint, to service@echemi.com. A staff member will contact you within 5 working days. Once verified, infringing content will be removed immediately.

    Contact Us

    The source of this page with content of products and services is from Internet, which doesn't represent ECHEMI's opinion. If you have any queries, please write to service@echemi.com. It will be replied within 5 days.

    Moreover, if you find any instances of plagiarism from the page, please send email to service@echemi.com with relevant evidence.