echemi logo
Product
  • Product
  • Supplier
  • Inquiry
    Home > Chemicals Industry > Petrochemical News > Southwest Engineering's Xinshen 102D Well Three Sets Two New Records

    Southwest Engineering's Xinshen 102D Well Three Sets Two New Records

    • Last Update: 2021-08-10
    • Source: Internet
    • Author: User
    Search more information of high quality chemicals, good prices and reliable suppliers, visit www.echemi.com

    Sinopec News Network reported on July 6, the Xinshen 102D well drilled by the 70149 Drilling Team of Southwest Petroleum Engineering Company Drilling No.
    1 Branch had a daily footage of 168m, setting the highest daily footage record for the third section of the Xu section of a marine ultra-deep well in western Sichuan
    .


    At the same time, the ROP of a single drill bit was 7.


    The Xinshen 102D well is an ultra-deep directional well deployed by the Southwest Oil and Gas Company in the Xinchang structure of the Western Sichuan Depression in the Sichuan Basin.
    It is also the first high-sulfur drilling and production simultaneous development well with a designed well depth of 6,448 meters
    .


    In the Xinchang structure, especially the Xujiahe Formation after three openings, the formation is highly abrasive, resulting in low ROP and low life of a single bit


    To this end, first, the 70149 drilling team earnestly implemented the spirit of the group’s vice president Liu Hongbin’s on-site investigation speech, focused on the “four improvements” to achieve efficiency goals, and scientifically promoted speed and efficiency; the second was to fully learn from the construction experience of the Xinshen 101D well and earnestly Study and research design plans, strictly implement technical measures and comply with operating procedures and specifications; third, under the guidance of the company’s engineering technology department and technical support center, further optimize drill bits, optimize drilling parameters, optimize drilling fluid performance, and timely conduct drilling time efficiency analysis and formulate Targeted construction measures; fourth is to strengthen cooperation with drill bit manufacturers, directional wells, mud logging and other collaborating parties to form a combined force for speed and efficiency


    With the joint efforts of everyone, the Xinshen 102D well has a daily footage of 168m and a single bit ROP of 7.


    (Wang Qiang, Zhang Guangwei, Lin Shixin)

    This article is an English version of an article which is originally in the Chinese language on echemi.com and is provided for information purposes only. This website makes no representation or warranty of any kind, either expressed or implied, as to the accuracy, completeness ownership or reliability of the article or any translations thereof. If you have any concerns or complaints relating to the article, please send an email, providing a detailed description of the concern or complaint, to service@echemi.com. A staff member will contact you within 5 working days. Once verified, infringing content will be removed immediately.

    Contact Us

    The source of this page with content of products and services is from Internet, which doesn't represent ECHEMI's opinion. If you have any queries, please write to service@echemi.com. It will be replied within 5 days.

    Moreover, if you find any instances of plagiarism from the page, please send email to service@echemi.com with relevant evidence.