-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
- Cosmetic Ingredient
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
In the past few days, the Tenth Construction Company of Refining and Chemical Engineering has taken various measures to fully promote the process pipeline construction of Sinochem Quanzhou 1 million tons/year ethylene project, creating favorable conditions for the ethylene plant to achieve the high-standard CCCC goal by the end of 201
Since the beginning of July, the Tenth Construction Sinochem Quanzhou Engineering Project Department has been guided by the work of "management innovation and work efficiency improvement", with the construction of the process pipeline of the 1 million tons/year ethylene project as the key line, according to the drawings and materials in pla.
Faced with the total welding volume of process pipelines of up to 1,100,000 inches in diameter of the ethylene plant, the project department made scientific deployments, carefully organized, and closely cooperated with the owner and the general contractor to implement the process pipeline drawings and materia.
In the construction quality control, the project department requires the construction personnel to strictly control the welding process discipline, strengthen the welding material distribution management, make visual technical disclosures to the welding operators, and analyze the common welding quality problems that may occur during the construction in the rainy season, so as to achieve Eliminate hidden quality problems at the sour.
At present, with the successive entry of a large number of process pipeline materials, the project department continues to accelerate the construction process of process pipelines according to the overall construction target of 1 million tons/year ethylene plant to ensure the safe, high-quality and efficient construction of the entire ethylene proje.