echemi logo
Product
  • Product
  • Supplier
  • Inquiry
    Home > Chemicals Industry > Petrochemical News > The Linpan Oil Production Plant increases reserves by 1.3 million tons in half a year

    The Linpan Oil Production Plant increases reserves by 1.3 million tons in half a year

    • Last Update: 2021-08-10
    • Source: Internet
    • Author: User
    Search more information of high quality chemicals, good prices and reliable suppliers, visit www.echemi.com

    In the first half of the year, the Shengli Oilfield’s Linpan Production Plant’s fine structure interpretation and reservoir research have deepened the understanding of reservoir formation.
    A total of 10 rolling wells and reservoir evaluation wells have been approved in favorable blocks, and 6 of them have been drilled.
    , All have seen good results, and 4 plans for capacity construction in the new area have been prepared, adding 1.
    313 million tons of new geological reserves
    .

    In the Xia492 fault block area, they deepened the geological understanding of small faults controlling reservoirs, finely portrayed low-order faults, deployed and drilled the Xia492-inclination 2 well, interpreted multiple sets of oil layers, and added 303,000 tons of new geological reserves.
    It is planned to build a new year.
    The production capacity is 7,200 tons
    .

    In the Tianjia area, they macroscopically analyzed the distribution law of low-order faults, evaluated low-order faults microscopically, and used new technologies to improve interpretation accuracy.
    Three new favorable traps were discovered in the Tian1 fault block area under Sha2, and Tian5 was deployed and implemented.
    -The deviated well 50 was successful, and it plans to use 261,000 tons of geological reserves and build an annual production capacity of 3,100 tons
    .

    The technical staff strengthened the reservoir prediction for the turbidite fan sand bodies on the third part of Shahejie, and deployed Well Tian 3-Scoliosis 1 in the 5 sand group of Block Tian 3-6, adding 140,000 tons of geological reserves, and planning to build an annual production capacity of 2400 tons
    .

    The plant focuses on multiple explorations with one well to maximize benefits
    .


    For example, Well Tang 1-Xi 111 deployed to drill small fault block narrow strip oil reservoirs, and explored three sets of Es3 middle, Es3, and Es2 formations.


      Technicians are also actively changing their geological understanding
    .


    In the Tang 4 fault block area, they used Tangzhuang single-point high-density seismic data to reinterpret the Tangzhuang T3 structure, and compared with the original Panhe high-precision data interpretation results, they found differences


      (Chen Hongjuan and Wang Zhimin)

    This article is an English version of an article which is originally in the Chinese language on echemi.com and is provided for information purposes only. This website makes no representation or warranty of any kind, either expressed or implied, as to the accuracy, completeness ownership or reliability of the article or any translations thereof. If you have any concerns or complaints relating to the article, please send an email, providing a detailed description of the concern or complaint, to service@echemi.com. A staff member will contact you within 5 working days. Once verified, infringing content will be removed immediately.

    Contact Us

    The source of this page with content of products and services is from Internet, which doesn't represent ECHEMI's opinion. If you have any queries, please write to service@echemi.com. It will be replied within 5 days.

    Moreover, if you find any instances of plagiarism from the page, please send email to service@echemi.com with relevant evidence.