echemi logo
Product
  • Product
  • Supplier
  • Inquiry
    Home > Chemicals Industry > Petrochemical News > The oil layer thickness in the Zhuanghai area of ​​the Shengli Sea breaks a record

    The oil layer thickness in the Zhuanghai area of ​​the Shengli Sea breaks a record

    • Last Update: 2021-09-12
    • Source: Internet
    • Author: User
    Search more information of high quality chemicals, good prices and reliable suppliers, visit www.echemi.com

    Recently, the side well of Zhuanghai 26, an exploratory well in the Zhuanghai area of ​​Shengli Oilfield, was drilled.
    The electric survey explained the oil layer of 53.
    5 meters/12 layers and the oil-water layer of 16.
    5 meters/2 layers, setting a new record for the thickness of the oil layer encountered in the area
    .


    The side well of Zhuanghai 26 is a side-drilling drill using the original borehole of Well Zhuanghai 26 to expand the oil and gas range of the Zhuanghai Paleogene.


    In order to understand the oil and gas conditions of the Paleogene and Mesozoic in the 26 block of Zhuanghai in the Zhuanghai area, in November 2020, the offshore oil production plant deployed and implemented the pre-exploration well Zhuanghai 26 on the principle of multi-layer exploration.
    The electrical survey of the biosphere strata explained the oil dry layer at 5.
    2 meters/1 layer, and the fracturing test produced 39.
    3 tons of oil per day; the Dongying Formation and the Shahejie Formation were located in the lower part of the structure, and the drilling encountered oil and gas showed lower levels, only in Dongying.
    The drilling effect is not satisfactory
    .

    According to the analysis of the technicians of the Ocean Plant, the eastern part of Well Zhuanghai 26 is located in the high part of the structural trap, and the accumulation conditions are more favorable.
    It can also explore the oil content of the internal Mesozoic structural trap in the eastern part of Block 26 in Zhuanghai
    .


    They comprehensively considered factors such as improving the utilization rate of the drilling platform and saving the cost of drilling footage, and decided to use the original borehole of Zhuanghai 26 well for sidetracking and succeeded


    This article is an English version of an article which is originally in the Chinese language on echemi.com and is provided for information purposes only. This website makes no representation or warranty of any kind, either expressed or implied, as to the accuracy, completeness ownership or reliability of the article or any translations thereof. If you have any concerns or complaints relating to the article, please send an email, providing a detailed description of the concern or complaint, to service@echemi.com. A staff member will contact you within 5 working days. Once verified, infringing content will be removed immediately.

    Contact Us

    The source of this page with content of products and services is from Internet, which doesn't represent ECHEMI's opinion. If you have any queries, please write to service@echemi.com. It will be replied within 5 days.

    Moreover, if you find any instances of plagiarism from the page, please send email to service@echemi.com with relevant evidence.