echemi logo
Product
  • Product
  • Supplier
  • Inquiry
    Home > Chemicals Industry > Petrochemical News > "Three Eyes Open Together" at the No. 3 Northwest Plant to protect the ecological highlands of the Tarim River

    "Three Eyes Open Together" at the No. 3 Northwest Plant to protect the ecological highlands of the Tarim River

    • Last Update: 2021-09-06
    • Source: Internet
    • Author: User
    Search more information of high quality chemicals, good prices and reliable suppliers, visit www.echemi.com

    In order to implement Sinopec Group's vision and goal of building a world-leading clean energy chemical company, a beautiful landscape with garden-like factories, ecological emission facilities, wetland parks, and bird habitats harmoniously developed has been built


    "Three eyes open at once" care for the ecological environment, the scenery here is unique


    "Sky Eye Watch": "Remote control" a world

    "Why is there a black spot near the TP-18 mixed transportation pumping station? Couldn't it be a leak in the pipeline?" On June 9, a drone operator in the second oil production management zone of the third oil production plant was at the TP-18 mixed transportation pumping station.


    Different from the line inspection method, this time the UAV is used to conduct a comprehensive inspection of the pipeline, which is the “eye of the sky” of the third oil production plant watching the ecological environment of the oil field


    "In the past, we relied on a single manual line inspection, inspection, and analysis to work on safety and environmental protection.


    Like real-time monitoring of a person’s health, there are 478 wells in the third oil production plant, within a range of 1,511.


    He Zhenggang introduced that in order to facilitate the rapid discovery and disposal of all abnormal conditions in the pipeline, the third oil production plant used the principle of "heat source tracking" to realize the UAV to track and photograph the heat source, which can find and find abnormal points to the greatest extent


    When the flood season is approaching, "Tianyan Watch" Tofutai, 10th District South, 11th District, 8th District and other key flood control production areas, the waters, oil wells, and surrounding environment are checked and compared through aerial photography, so that the hidden dangers of flood prevention can be found Elimination is more precise and protects the ecological environment of the oilfield during the flood season


    Keeping the eye on the watch not only improves the efficiency and quality of patrol, but also greatly reduces safety and environmental risks


    "Earth Eye Detective": "dig out" hidden dangers

    "Well TK834 has alarmed due to high back pressure, please immediately conduct on-site investigation in the first area of ​​the oil production management


    After 20 minutes, the site was checked in time and it was confirmed that the pipeline was slightly clogged.


    Advanced technologies such as the Internet, cloud computing, and decision-making assistance systems are also known as "earth and eye detection".


    Nowadays, deep underground pipelines have abnormal problems such as high pressure, low pressure, puncture and leakage.


    According to reports, there are a total of 809 oil pipelines in the third oil production plant.


    This year, the third oil production plant has discovered and solved more than 100 hidden pipeline problems through the "earth and eye detection", effectively preventing the faulty operation of the problematic pipeline


      "Human Eye Supervision": "Brighten Up" the beautiful Tahe

      Although the "sky eye and earth eye" belong to high technology, not all environmental hazards can be detected.


      On May 13, Qian Xinsheng, safety and environmental protection inspector of the third oil production plant, discovered during inspection at the T702CH3 well station that about 5 square meters of oily sewage fell on the side of the water injection pump.
    If it is not treated in time, it may cause large-scale pollution
    .

      After Qian Xinsheng discovered the hidden dangers of the T702CH3 well station, according to the workover operations in the "Environmental Protection Implementation Rules" of the third oil production plant, the requirements of the slop oil and oily sewage must not be reached
    .
    Qian Xinsheng notified the construction unit .

      The construction unit carried out rectification as required, cleaned up the oily wastewater in time, and reinforced the connection between the water injection pump and the pipeline to prevent the oily wastewater from landing
    .

      "Supervising the ecological environment is an important responsibility of safety and environmental supervision
    .
    " Qian Xinsheng said that he immediately took pictures and reported environmental problems, and notified the on-site personnel to make rectifications.
    Afterwards, they checked the implementation of rectifications against the photos
    .

      The "human eye" of safety and environmental protection supervision is the "third eye" of the ecological environment
    .
    Up to now, 4 safety and environmental protection supervisors in the active production line of the third oil production plant have discovered 22 safety and environmental protection hazards through human eye testing.
    Since they were found to be disposed of in a timely manner, none of them caused environmental pollution
    .

      Provide "physical examination", "diagnosis" and "treatment" for corporate environmental management and regional ecological environment
    .
    Through the "third eye" and "prescription for pulse diagnosis", the water in the Tarim River is clearer and the sky is bluer
    .

      (Zhao Yun)

    This article is an English version of an article which is originally in the Chinese language on echemi.com and is provided for information purposes only. This website makes no representation or warranty of any kind, either expressed or implied, as to the accuracy, completeness ownership or reliability of the article or any translations thereof. If you have any concerns or complaints relating to the article, please send an email, providing a detailed description of the concern or complaint, to service@echemi.com. A staff member will contact you within 5 working days. Once verified, infringing content will be removed immediately.

    Contact Us

    The source of this page with content of products and services is from Internet, which doesn't represent ECHEMI's opinion. If you have any queries, please write to service@echemi.com. It will be replied within 5 days.

    Moreover, if you find any instances of plagiarism from the page, please send email to service@echemi.com with relevant evidence.