-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
- Cosmetic Ingredient
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
Sinopec News.
com News from the Shengli Oilfield Downhole Operation Center Gudong Operation Area upgraded safety and environmental protection work in special periods, taking responsibility as the starting point, taking risk reduction and control risk as the lead, and comprehensively carrying out the "three zeros" safety and environmental protection Project, actively create a good safety development atmosphere, and consolidate the foundation of safety development
.
"Zero tolerance" for illegal operations
.
The operation area takes the central HSSE management system as a guide, improves the responsibility system of all departments and levels, clarifies the list of responsibilities, and all employees perform responsibilities
Cadres sink into the front line, leading the standard operation and standard construction of the team staff
.
Adhere to the problem orientation in the construction, carefully analyze the low level of the production process, the low level of technical management, check ideas, check management, check technology, make up for shortcomings, strengths and weaknesses, promote improvement, and truly emphasize politics and stress.
They report violations through the internal network homepage, QHSSE regular meetings, etc.
, take measures such as suspension of work and production, interviews, demotions and dismissal to hold relevant personnel accountable, and effectively enhance the awareness of safety and environmental protection and responsibility of all employees, and pay close attention to the QHSSE work
.
"Zero accidents" in safe production
.
The operation area has paid attention to the investigation and management of special hidden dangers, and carried out work such as responsibility identification, scoring assessment, and formulation of control measures.
Each grass-roots project department implements self-management and self-supervision, grasps daily risk identification, management and control, eliminates various risks, and creates a zero-accident operation site
.
While implementing the dual prevention mechanism, they strengthened the safety performance appraisal, used the thousand-point system and scoring management, and solved the problems of operation and command violations of the wellhead post, the deputy manager of the work team, the team leader and the deputy manager of the project department.
Environmental protection "zero pollution"
.
Standardized on-site construction is carried out in this operation area
(Wang Xizhen)