echemi logo
Product
  • Product
  • Supplier
  • Inquiry
    Home > Chemicals Industry > China Chemical > With the release of heavy policy, the chemical raw material medicine industry is facing challenges!

    With the release of heavy policy, the chemical raw material medicine industry is facing challenges!

    • Last Update: 2021-06-08
    • Source: Internet
    • Author: User
    Search more information of high quality chemicals, good prices and reliable suppliers, visit www.echemi.com
    [ Policies and Regulations of Chemical Machinery and Equipment Network ] APIs are important substances in the production of drugs.
    After a long period of continuous development, my country has become a major producer and exporter of APIs, and it occupies an important position in the international market.
    In recent years, with the advancement of environmental protection policies, the chemical raw material industry is also facing stricter requirements in the development process, and it is necessary to further strengthen the research and development of green process production technology for raw materials.
    Chemical Machinery and Equipment Network Policies and Regulations Chemical Machinery and Equipment
    According to news on May 27, led by the Ningxia Department of Ecology and Environment, the Department of Industry and Information Technology and the Department of Emergency Management have formulated and issued environmental access guidelines for three construction projects including chemical raw materials, pesticides, and dyes, and strictly construct projects from the institutional level.
    Environmental access aims to standardize the environmental management of construction projects in three industries, including chemical raw materials, and effectively improve the level of green development of the industry.

     

    According to the guidelines on environmental access for the chemical API industry, the guidelines stipulate the planning and layout of the Ningxia chemical API and intermediate industry, project site selection, technical equipment level, pollution prevention and control measures, total volume control and clean production, and environmental management, etc.
    Basic requirements.

     

    Among them, in terms of planning and layout, the site selection for new construction, reconstruction, expansion, and relocation of chemical raw material medicine projects must meet the main function zone planning, land and space planning and the "three lines and one single" ecological environment zoning management and control requirements.

     

    In terms of technical equipment level, encourage chemical raw material drug companies to independently develop and innovate, and introduce advanced design concepts, production technologies and management systems at home and abroad; the choice of production technology and equipment should be conducive to promoting energy conservation and emission reduction, and conducive to the separation of pollution Reduce fugitive emissions.

     

    In addition, each production process unit should vigorously upgrade the equipment level according to 11 requirements, including: advocating the use of continuous production technology and quantitative control technology, increasing product yield, and reducing the amount of pollutants; encouraging the use of advanced transportation equipment and transportation technology.
    Liquid VOCs materials should be transported in closed pipelines or closed and dosed in high-level tanks (tanks), barrel pumps and other feeding methods.
    If the dosing cannot be sealed, it must be operated in a confined space, or local gas collection must be performed, and the waste gas must be discharged to the VOCs waste gas collection and treatment system; powder and granular VOCs materials should be pneumatically conveyed or a closed solid feeder should be used.
    Airtight dosing.
    If the dosing cannot be sealed, it must be operated in a confined space, or local gas collection must be carried out, and the waste gas must be discharged to the dust removal facility, VOCs waste gas collection and treatment system, etc.  
    Conveying equipment
      In terms of pollution control measures, including water pollution control measures, air pollution control measures, soil and groundwater pollution control measures, solid waste pollution control measures, and environmental risk control measures, relevant control measures are stipulated according to different pollutants.

     

      In addition, in terms of total volume control and clean production, chemical raw material drug construction projects must meet the national and autonomous regional total volume control requirements to ensure that the regional environmental quality does not deteriorate.
    If the raw materials, intermediate products, products and pollutants discharged in production involve the substances listed in the "List of Priority Control Chemicals", the mandatory clean production audit shall be carried out in accordance with the requirements of relevant laws and regulations.
    Newly built projects should reach the domestic advanced level of cleaner production.

     

      According to the schedule, the guidance will be implemented on January 1, 2023, and a two-year upgrade and transformation period has been reserved for established enterprises.
    In the past two years, the chemical raw material medicine industry will undoubtedly face a big challenge!
     

      Original title: With the release of heavy policy, the chemical raw material medicine industry is facing challenges!
    This article is an English version of an article which is originally in the Chinese language on echemi.com and is provided for information purposes only. This website makes no representation or warranty of any kind, either expressed or implied, as to the accuracy, completeness ownership or reliability of the article or any translations thereof. If you have any concerns or complaints relating to the article, please send an email, providing a detailed description of the concern or complaint, to service@echemi.com. A staff member will contact you within 5 working days. Once verified, infringing content will be removed immediately.

    Contact Us

    The source of this page with content of products and services is from Internet, which doesn't represent ECHEMI's opinion. If you have any queries, please write to service@echemi.com. It will be replied within 5 days.

    Moreover, if you find any instances of plagiarism from the page, please send email to service@echemi.com with relevant evidence.