echemi logo
Product
  • Product
  • Supplier
  • Inquiry
    Home > Chemicals Industry > Chemical Technology > Yan'an Petrochemical opens up a new path for fuel gas

    Yan'an Petrochemical opens up a new path for fuel gas

    • Last Update: 2022-11-04
    • Source: Internet
    • Author: User
    Search more information of high quality chemicals, good prices and reliable suppliers, visit www.echemi.com

    Recently, the Yan'an Petrochemical Plant diverted surplus hydrogen to the light hydrocarbon fuel gas system as fuel gas, reducing unnecessary combustion emissions from flares, optimizing resource allocation, opening up a new path for fuel gas, and achieving the "win-win" goal of
    energy conservation and emission reduction.

    It is understood that in view of the surplus hydrogen in the device, the Yan'an Petrochemical Plant carries out technical transformation of the hydrogen and fuel gas process system inside the hybrid dehydrogenation unit on the basis of overall balance of the plant area and light hydrocarbon fuel gas, that is, a new hydrogen line is added, the reforming surplus hydrogen is led to the outlet of the mixed dehydrogenation analytical gas compressor, and sent to the fuel gas pipeline network for reuse, under the premise of ensuring the purity of the outlet hydrogen of pressure swing adsorption (PSA), the fuel gas production is maximized, the flare emission is reduced, thereby reducing coal consumption

    On this basis, the plant continuously optimized the gas cabinet start-up plan and implemented control measures
    .
    After many efforts, the light hydrocarbon gas cabinet was successfully operated, creating conditions
    for the boiler to burn fuel gas at full load.
    "We have successively overcome many difficulties
    such as unstable low-pressure gas inflow, large fluctuations in system pressure, frequent trigger interlocking of the gas cabinet exhaust piston stroke, and increased output of high chemical oxygen demand (COD) wastewater.
    " Li Huailiang, deputy manager of the production planning department of Yan'an Petrochemical Plant, said
    .

    After the successful operation of the gas cabinet, the plant actively organized the mixing of fuel gas, increased the original 1# boiler gas to 2 boilers to mix gas, and increased the number of air guns from the original 4 to 8, which can save 4.
    5 tons
    of coal per hour.

    This article is an English version of an article which is originally in the Chinese language on echemi.com and is provided for information purposes only. This website makes no representation or warranty of any kind, either expressed or implied, as to the accuracy, completeness ownership or reliability of the article or any translations thereof. If you have any concerns or complaints relating to the article, please send an email, providing a detailed description of the concern or complaint, to service@echemi.com. A staff member will contact you within 5 working days. Once verified, infringing content will be removed immediately.

    Contact Us

    The source of this page with content of products and services is from Internet, which doesn't represent ECHEMI's opinion. If you have any queries, please write to service@echemi.com. It will be replied within 5 days.

    Moreover, if you find any instances of plagiarism from the page, please send email to service@echemi.com with relevant evidence.