echemi logo
Product
  • Product
  • Supplier
  • Inquiry
    Home > Chemicals Industry > Petrochemical News > Zhongyuan Petroleum Engineering Company does a good job in flood prevention and flood prevention in an all-round way

    Zhongyuan Petroleum Engineering Company does a good job in flood prevention and flood prevention in an all-round way

    • Last Update: 2021-08-09
    • Source: Internet
    • Author: User
    Search more information of high quality chemicals, good prices and reliable suppliers, visit www.echemi.com

    Sinopec News Network reported on July 12, the 50727 team of Drilling Third Company organized a commando team of party members to inspect sacks, sandbags, life jackets and other flood control materials, and reported the flood control situation to the superior production command center
    .

    On July 11, there was a sudden torrential rain in Puyang, with extremely heavy torrential rain in some areas
    .


    The production command center of Zhongyuan Petroleum Engineering Company initiated emergency response as soon as possible, and sent rainstorm warning information to all units through the nail group, emergency telephone, etc.


    Improve the management and control mechanism, and implement flood prevention responsibilities layer by layer
    .


    In the early stage, Zhongyuan Petroleum Engineering Company held a special meeting to study and deploy work safety and natural disaster prevention, sort out the distribution of natural disaster risks in construction areas, establish and improve natural disaster risk accounts, clarify risk control measures and responsible persons, and inspect party members and cadres to perform their duties and perform their duties.


    Each unit in charge of the business department guides the grassroots units to complete the risk list, timely report the hidden dangers that are prone to landslides, mudslides, floods and other risks, and jointly formulate practical remediation measures; establish and improve the listing supervision system for major hidden dangers, and implement listings for major hidden dangers Supervise and rectify within a limited time, and assign the responsibility of natural disaster prevention and control to teams and positions
    .

    Strict inspections during flood seasons and effective implementation of prevention and control measures
    .


    In view of the long time and wide range of this rainfall, on July 10, Zhongyuan Petroleum Engineering Company paid close attention to important facilities and weak links, relying on the methods of "Four Nos and Two Straight" inspections to seriously carry out pre-flood risk investigation


    The production and operation department arranges special personnel to track the implementation of risk investigation and implementation of measures, combined with the characteristics of the flood situation, to reorganize and refine the accuracy of major risk research and judgment, the pertinence of management and control measures, and the effectiveness of implementation of responsibilities.
    Clear risk distribution, fully identify risk factors, and fully implement control measures
    .

    Strengthen emergency duty and improve disaster handling capabilities
    .


    On July 11, when the rainstorm is approaching, Zhongyuan Petroleum Engineering Co.


      After the rainstorm came, all grassroots units immediately activated relevant emergency plans to prepare for flood prevention and drainage at any time
    .


    At the same time, the company also strengthened the enterprise-local emergency linkage mechanism and emergency rescue on-duty standby system to ensure that it can deal with all kinds of dangerous situations in the first time


      The flood prevention material reserves are sufficient, and the material deployment personnel are on duty 24 hours a day
    .


    On July 11, after receiving the rainstorm warning information, the material management departments of Zhongyuan Petroleum Engineering Company at all levels immediately activated the emergency plan, and the material deployment personnel were on duty 24 hours to make preparations for material deployment


      In the early stage, the company's material management department had planned and coordinated in advance, and prepared plans for flood control materials and emergency rescue materials in advance, and flood control materials had sufficient reserves
    .


    As of 8 a.


      (Wei Yuanjun Qiu Mingzhe)

    This article is an English version of an article which is originally in the Chinese language on echemi.com and is provided for information purposes only. This website makes no representation or warranty of any kind, either expressed or implied, as to the accuracy, completeness ownership or reliability of the article or any translations thereof. If you have any concerns or complaints relating to the article, please send an email, providing a detailed description of the concern or complaint, to service@echemi.com. A staff member will contact you within 5 working days. Once verified, infringing content will be removed immediately.

    Contact Us

    The source of this page with content of products and services is from Internet, which doesn't represent ECHEMI's opinion. If you have any queries, please write to service@echemi.com. It will be replied within 5 days.

    Moreover, if you find any instances of plagiarism from the page, please send email to service@echemi.com with relevant evidence.