echemi logo
Product
  • Product
  • Supplier
  • Inquiry
    Home > Coatings News > Resin News > 10 types of projects will be approved by the environmental assessment "management card"

    10 types of projects will be approved by the environmental assessment "management card"

    • Last Update: 2021-03-31
    • Source: Internet
    • Author: User
    Search more information of high quality chemicals, good prices and reliable suppliers, visit www.echemi.com

    [China Epoxy Industry Online] December 15, 2004 learned from the State Environmental Protection Administration that in the future, projects that are explicitly eliminated, prohibited from construction by the state, and do not conform to the national industrial policy, and included in the scope of the State Council’s clean-up and rectification, do not conform to the national policy The required 10 types of projects, including steel, electrolytic aluminum, cement, calcium carbide, ferroalloy, coke, flat glass, and thermal power units of 135,000 kilowatts and below, will not be approved by the environmental assessment.

    It is understood that the State Environmental Protection Administration announced on December 13 that 10 types of projects are not allowed to pass the environmental review and approval.


    These projects are: located in drinking water source protection areas, nature reserves, scenic spots, important ecological function areas, and ecological environment sensitive areas, projects that affect the ecological environment and pollute the environment; projects that do not conform to the overall urban planning and environmental protection planning ; Projects located in the core area and buffer zone of the nature reserve; occupying the experimental area of ​​the nature reserve and causing damage to the local ecological environment, or built in the periphery of the nature reserve, but damaging the environmental quality and ecology in the nature reserve Functional construction projects; the pollutant discharge of the original facilities does not meet the national and local emission standards and total control requirements, and the measures of “replace the old with the new” and “replace the small with the big” can not be adopted to achieve “increased production without increasing pollution” Projects with serious environmental pollution, inferior product quality, high energy consumption, high material consumption, high water consumption, and pollutants that cannot meet the discharge standards; where the environmental quality cannot meet the requirements of the environmental function zone and the pollution load cannot be reduced through alternative measures such as regional balance Projects; new, expansion, and renovation projects for companies that have been explicitly ordered to control the pollution within a time limit, as well as the pollution control projects in the "Two Control Area" pollution control plan, the Three Gorges Reservoir area and the upstream water pollution control plan that did not complete the pollution control task within the deadline.


    This article is an English version of an article which is originally in the Chinese language on echemi.com and is provided for information purposes only. This website makes no representation or warranty of any kind, either expressed or implied, as to the accuracy, completeness ownership or reliability of the article or any translations thereof. If you have any concerns or complaints relating to the article, please send an email, providing a detailed description of the concern or complaint, to service@echemi.com. A staff member will contact you within 5 working days. Once verified, infringing content will be removed immediately.

    Contact Us

    The source of this page with content of products and services is from Internet, which doesn't represent ECHEMI's opinion. If you have any queries, please write to service@echemi.com. It will be replied within 5 days.

    Moreover, if you find any instances of plagiarism from the page, please send email to service@echemi.com with relevant evidence.