-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
- Cosmetic Ingredient
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
China Paint Network
News:
18 morning, the reporter received reports from the public that an anshan all the way west Wu Road junction of a high-rise construction site is doing
wall paint
construction, a lot of mud ideas from the sky, landed in the car parked outside the enclosed. Reporters at the scene of the interview, a man wearing a hard hat suddenly pulled out his mobile phone to take pictures, but also stopped a worker ready to answer the matter. At about 9 am on the 18th, the reporter found a light-colored Volvo sedan covered with mud ideas at the intersection of West Wu Road in Anshan. "I just went to brush the car in the morning, I didn't think it was like this!" The owner told reporters that he had been parked on the side of the road, these days the site of high-rise buildings began to do external wall painting, falling mud ideas just dripped on his car and other vehicles. "When I washed my car, I specifically told you, but I still doesn't brush it off, I really don't know what to do." The owner gently wiped the mud idea with his hand, and the body soon left a trace of mud. "There was mud on the body before!" A citizen told reporters that the night before, several cars parked in the same location were forced by mud "text." Reporters noted that half of these vehicles riding on the sidewalk, the other half of the body parked on the road, and the sidewalk on the other side of the fence is marked "Haichuan Construction" a high-rise construction site, many workers are on the outside of the building on the lift painted walls. Reporters noted that the sidewalk fence has "upstairs
paint
construction, no parking, the consequences of the self-responsible" prompt slogan, and the earliest one of the prompt slogan date is November 2. Reporters noted that although the fence has been pasted with a prompt slogan, but the owners still feel that the construction party is responsible. "Now that the wind is so strong, construction is high, these mud ideas don't fall on cars parked on the side of the road, they fall on other passers-by." Some car owners questioned that the construction party did not do a good job in time to prevent paint spill protection measures, also did not inform them in a timely manner.