    Purified water equipment, softened water equipment and ultra-pure water equipment are common in water treatment equipment.
    water softening equipment is to remove Ca, Mg plasma in water, reduce the hardness of water, so that water softening water treatment equipment.
    water quality of soft water equipment is good, the system is stable, used by many enterprises, ultra-pure water equipment water quality is good, suitable for the production needs of all types of enterprises, the scope of use will gradually expand.
    purified water equipment water quality of the basic requirements of purified water equipment in medicine, biomedicine and other industries.
    but what are the basic standards for purified water quality? Both the Chinese Pharmacopeia and the European Pharmacopeia have made it clear that raw water for pharmaceutical water must meet at least drinking water standards.
    if they do not meet the standards, they will evolve until they meet the standards.
    other bacteria are not allowed to exceed 100 /ml, except for E. coli, which is clearly defined.
    in the process of water purification equipment, there will also be internal pollution, purified water equipment in a variety of water treatment devices may become a source of pollution.
    so must often clean and disinfect the purified water equipment, in addition, the end of the purified water equipment should also be installed sterilization and disinfection device.
    purified water equipment water quality characteristics of purified water equipment water quality in line with the national health standards, in line with the actual production standards of enterprises.
    water from pure water equipment - purified water has two characteristics.
    is the gradual increase in sterilization equipment installed with purified water equipment.
    feature of the pipeline distribution system of purified water equipment is that the traditional water delivery lines are replaced by circulating lines, both of which are designed to control microbial contamination and the increase of bacterial endotoxins.
    , we should also pay attention to the effect of the flow rate in the tube on microbial reproduction, that is, the flow rate in the pipe is too low or blocked, it may cause the reproduction of microorganisms increased, affecting water quality.
    of the installation location of the softening water equipment 1, the softening water equipment should be as close to the drainage as possible.
    2, if other water treatment equipment is required, the installation location should be reserved.
    3, because of the regular addition of salt to the salt box, should be set the location of salt.
    4, do not install the softening water equipment within 3 meters from the boiler, otherwise the hot water will flow back into the softening water equipment, causing damage.
    5, the softening water equipment should be placed at room temperature below 1 degree C and above 49 degrees C.
    the use of water softening water equipment after a long period of use, to follow certain precautions.
    1, softening water equipment in use when the inring should be open for a long time, unless the equipment maintenance needs to be turned off.
    the water valve can be closed without water.
    2, if the water can be regenerated manually if the water is not fully caused by the regeneration of the softening water equipment.
    3, softening water equipment in the long-term deactivation of the need to inhale salt water into the tank protection.
    4, when put into use again only need to prepare and normal work of the same salt water, first open the water valve, and then connect the power supply, let the equipment reset itself and then manually regenerate once finished to open the water valve.
    , if the industrial salt used is too dirty, should be cleaned once a year salt barrels to ensure the smooth progress of the salt absorption process.
    ultra-pure water equipment installation standard 1, equipment installation site should be selected in a flat, clean environment, close to the power supply, water environment.
    2, do not approach the source of the fire and any heating body to avoid heat affecting the efficiency of its operation.
    3, in the northern region shall not be installed outdoors, in order to prevent the equipment from freezing, damage to the instrument and filter elements.
    4, equipment installation location should be convenient drainage, so that the equipment drainage pipe to maintain smooth.
    5, the pump pressure used in the system to ensure that 1.0-1.2Mpa, to ensure that the pump in its rated range of elevation.
    work cycle of each equipment is as follows: 1, quartz sand filter cumulative work 2900 hours, quartz sand filter should be replaced.
    2, activated carbon adsorption filter: when the export residual chlorine content of >0.1mg/L, should be replaced with activated carbon filter material, in general, after 720 hours of cumulative work, should be replaced with activated carbon filter material.
    3, security filter in general, the cumulative work of 720 hours should be replaced with fine filter.
    the fine filter element should also be replaced when the outlet pressure <0.04Mpa is at work and the panel water shortage light is on.
    4, reverse osmosis filter cumulative work 240 hours, the application of drugs to clean RO membrane once.
    the RO film after a cumulative 2900 hours of service.
    note that for your safety, be sure to ground the machine ground wire reliably.
    preprocessor operating instructions 1: multi-media filter operating instructions: A, multi-media filter placed in a suitable place, remove the filter top filter valve, according to the bottom-up order fill thick, fine quartz sand, tighten the top multi-valve.
    B, water, power.
    C, refer to the multi-media valve instructions for the multi-media filter filter material back-flushing, positive flushing, until the filter water clarification, the multi-valve spin to the working position.
    D, quartz sand must be installed naked to ensure the filtration effect.
    (note should not be bagged) 2: active carbon adsorption filter operating instructions: A, activated carbon adsorption filter placed in a suitable place, remove the filter top filter valve, according to the bottom-up order filled with coarse quartz sand bottom, and then filled with activated carbon, tightening the top multi-valve.
    B, water, power.
    C, refer to the multi-valve instructions for the activated carbon adsorption filter filter filter material back-flushing, positive flushing, until the filter water clarification, the multi-valve spin to the working position.
    D, activated carbon must be naked to ensure the filtration effect.
    (note should not be bagged) 3: Resin softening filter operating instructions: A, resin softening filter placed in a suitable place, remove the filter top softening valve, fill cation softening resin, tighten the top multiple valve.
    B, water, power.
    C, incoming water softening filtration operation: refer to the multi-valve instructions for the resin softening filter filter material back-flushing, positive flushing, until the filter water clarification, the multi-valve spin to the working position.
    : when starting to enter the water should first enter the water valve open 1/3 position, wait for the softener drain out of the water before the water valve slowly open.
    D, resin regeneration operation steps in accordance with the reverse wash, salt absorption, water, positive washing, operation step sequence operation can be, pay attention to the salt tank to always ensure that salt does not see water, that is, salt solution is saturated state.
    : When flushing and regenerating the pre-treatment, turn the original water pump switch to the manual position, and in normal operation, turn the raw water pump switch to the automatic position before the equipment can function properly.
    installation and commissioning procedures: 1, place the host and preprocessor close to the water and power supply.
    2, load quartz sand, activated carbon, softened resin and other filtration materials.
    3, connection water: raw water pump infringing and water connection, pre-filter outlet and host infringing connection, preprocessor, host drain are connected to the sewer with a pipeline.
    4, circuit: first of all, the ground wire reliable ground, and random distribution of power cord to the room electrical control box.
    5, into the water, power supply, in accordance with the "pre-treatment operation instructions" requirements of the step-by-step operation, pre-processing debugging operation completed.
    6, the use of this machine, the original water pump switch, dial in the automatic position, and turn off the shutdown switch.
    the water supply, power supply, until the first-stage pump pressure reached the pressure controller set value, the first-stage pump start-up work.
    first-stage pump, adjust the system pressure I. at 1.0-1.2Mpa.
    first time, the first stage RO membrane system should be manually flushed for 30 minutes.
    the first-stage RO system is working properly, the secondary pump starts working when the second-stage pump port pressure reaches the pressure controller setting. after the
    secondary pump is started, adjust the ROII.exit pressure between 1.2-1.5Mpa after 5 minutes of operation to open the secondary RO recovery rate control valve to a certain position, after 30 minutes of continuous flushing of the secondary RO system TO adjust the ROII.exit pressure to 1.2Mpa-1.5Mpa, the secondary RO system works normally.
    machine installation precautions: 1, equipment installation site should be flat, clean environment, close to the power supply, water.
    2, do not approach the source of the fire and any heating body.
    3, in the northern region shall not be installed outdoors, in order to prevent the equipment from freezing, damage to the instrument and filter elements.
    4, equipment installation location should be convenient drainage, so that the equipment drainage pipe to maintain smooth.
    (1) when the water pressure < 0.12Mpa.
    the < flow rate of 6.0T/H, the phenomenon of multi-stage pump starting --- stopping --- the machine operation is repeated.
    this time the machine will stop using, to prevent the burning of motors, water pressure and insufficient flow areas, please add raw water tank in front of this equipment.
    pressure used in the (2) system is ensured to be 1.0-1.2Mpa and that the pump is working within its rated range of flue.
    water operation 1, the operator panel of the original water pump switch, dialed in the automatic position, turn off the stop switch, turn on the water source, close the power supply to wait for the water pressure to reach the pressure controller setting, the device will automatically start work.
    2, the whole machine all into the working state, the adjustment system pressure at 1.0-1.3Mpa.
    3, if the multi-stage pump start-up difficulties, its outlet pressure relief control valve slightly off (but can not be fully closed to retain a certain amount of pass) until the multi-stage pump starts, and then turn it away.
    4, if the water pressure is too low or insufficient flow, please choose raw water tank or build a reservoir, the equipment can work properly. Note 1 in
    operation, the native water production at the water temperature of 25 degrees C or more than 2000L/H, water temperature rise or fall by 1 degree C, water production will increase or decrease by about 3%, which is determined by the characteristics of the RO membrane.
    2, into the RO membrane of water should strictly control the residual chlorine content of 0.1PPm below, the method is: adsorption filter sampling port water, with residual chlorine assay detection, if exceeded, should be replaced with activated carbon filter material.
    3, if the water intake is insufficient or the pressure is too low, the machine water shortage underpression system makes the equipment automatically shut down.
    4, the machine in the initial use, because the membrane contains preservatives.
    water and electricity conductivity will be high, rinse for 1-2 hours and normal water production for a period of time, water and electricity conductivity will be significantly reduced.
    This article is an English version of an article which is originally in the Chinese language on echemi.com and is provided for information purposes only. This website makes no representation or warranty of any kind, either expressed or implied, as to the accuracy, completeness ownership or reliability of the article or any translations thereof. If you have any concerns or complaints relating to the article, please send an email, providing a detailed description of the concern or complaint, to service@echemi.com. A staff member will contact you within 5 working days. Once verified, infringing content will be removed immediately.

    Contact Us

    The source of this page with content of products and services is from Internet, which doesn't represent ECHEMI's opinion. If you have any queries, please write to service@echemi.com. It will be replied within 5 days.

    Moreover, if you find any instances of plagiarism from the page, please send email to service@echemi.com with relevant evidence.