echemi logo
Product
  • Product
  • Supplier
  • Inquiry
    Home > Coatings News > Paints and Coatings Market > Carpentry paint shopping has learned construction points in advance collection

    Carpentry paint shopping has learned construction points in advance collection

    • Last Update: 2020-12-29
    • Source: Internet
    • Author: User
    Search more information of high quality chemicals, good prices and reliable suppliers, visit www.echemi.com
    China Coatings Online News Information: There are
    many precautions in the construction of woodworking coatings, the main points in the construction need to be collected in advance.
    northern spring decoration in addition to our previously mentioned attention to materials purchase and storage, as well as construction of fire, wind protection, in order to avoid decoration left regrets. Below for you to summarize some tips, convenient for everyone in the decoration and construction to do reference.
    1, carpentry construction techniques
    1, furniture production left interface seams
    s seams
    furniture production left interface seams
    because the northern spring air is relatively dry, in the production of furniture, because the wood is drier, so in order to prevent the rainy season when the arrival of the expansion, need to leave a certain degree of telescopic seams. In addition, there are wooden door installation also have to leave gaps.
    2, flooring to leave telescopic seams
    flooring to leave telescopic seams
    floor laying
    laying wooden floors, the wall should be set aside at least 1 cm or so of telescopic seams, in order to prevent the wet season expansion squeeze deformation. In order to prevent future wooden floors to step on the sound, in the laying should be strictly looking for flat bones. The common wooden wedges that connect the teel to the floor, due to changes in temperature and humidity, expand and contract from time to time in later use, and are prone to disengagement, so it is best to use plastic plugs with low expansion rates.
    2, paint paint construction techniques
    1, paint attention to dust-proof
    spainting
    painting attention to sand and dust
    has been said before, the northern region of spring wind and sand is larger, so in the paint, we need to pay special attention to prevent dust fall into the paint, resulting in paint film granulation and other effects of the situation.
    2, wall insulation layer needs to be handled
    Many new houses, are with the internal insulation layer of the new insulation wall, this internal insulation wall in the decoration is easy to appear latex paint dry cracking problem. For this situation, can be used with elastic decoration materials, for the wall to do grass-roots treatment, such as some special putty can make up for the cracks in the wall to a certain extent.
    Thred, other construction precautions
    1, the construction process pay attention to keep warm
    the construction process pay attention to keep warm
    Therefore, whether it is the tiler stirring mortar, or oil workers spray a variety of coatings, it is best not to open-air construction, should be in accordance with the temperature in the product description. In particular, oil work should pay more attention to "warm", in full drying before opening doors and windows ventilation.
    2, moderate ventilation to do a good job of finished product maintenance
    If it is a cross-year project, spring decoration should pay attention to open windows ventilation can not be too large north-south, otherwise the wind is larger, conflowing at the same time due to ceiling, wood, wall outside the internal moisture content is different, the internal and external rate of change is not consistent, it is easy to make the finished product cracks, increase the repair process.
    woodworking construction points, in advance collection, so that your home life more comfortable.
    This article is an English version of an article which is originally in the Chinese language on echemi.com and is provided for information purposes only. This website makes no representation or warranty of any kind, either expressed or implied, as to the accuracy, completeness ownership or reliability of the article or any translations thereof. If you have any concerns or complaints relating to the article, please send an email, providing a detailed description of the concern or complaint, to service@echemi.com. A staff member will contact you within 5 working days. Once verified, infringing content will be removed immediately.

    Contact Us

    The source of this page with content of products and services is from Internet, which doesn't represent ECHEMI's opinion. If you have any queries, please write to service@echemi.com. It will be replied within 5 days.

    Moreover, if you find any instances of plagiarism from the page, please send email to service@echemi.com with relevant evidence.