echemi logo
Product
  • Product
  • Supplier
  • Inquiry
    Home > Coatings News > Paints and Coatings Market > Coating technology: coating, mounting, soft package and detail engineering construction technology

    Coating technology: coating, mounting, soft package and detail engineering construction technology

    • Last Update: 2020-04-03
    • Source: Internet
    • Author: User
    Search more information of high quality chemicals, good prices and reliable suppliers, visit www.echemi.com
    Key tips: 1 Construction technical requirements and methods of finishing works Coating engineering includes water-based coating engineering, solvent coating engineering and art coating engineering (1) Preparation before painting construction (1) Finishing works shall be carried out after plastering, ceiling, details, ground and electrical works have been completed and accepted (2) The ambient temperature of water-based coating construction should be between 5 ~ 35 ℃, and attention should be paid to ventilation and dust prevention (3) Base treatment requirements (2) Finishing method 2、 Construction technical requirements and methods of mounting Engineering (1) Base treatment requirements ( Which is the price of Dajin diatom mud Recommended brief introduction: which is the price of Dajin diatom mud? How to buy genuine diatom mud? Guangdong diatom mud agent suggests placing a basin of cold water in the air conditioning room, so that the diatom mud wall can breathe effectively The feature of the breathing wall is obvious When the indoor air is dry, the diatom mud wall will release the absorbed water quickly Put it out to help regulate the indoor dry humidity It is suggested to place a basin of cold water in the air conditioning room, so that the wall of diatom mud can breathe effectively The feature of the wall that can breathe is obvious When the indoor air is relatively dry, the wall of diatom mud will absorb the water Coating home news: first, coating engineering construction technical requirements and methods coating engineering includes water-based coating engineering, solvent coating engineering, art coating engineering (1) Preparation before finishing construction (1) finishing works shall be carried out after plastering, ceiling, details, ground and electrical works have been completed and accepted (2) The ambient temperature of water-based coating construction should be between 5 ~ 35 ℃, and attention should be paid to ventilation and dust prevention (3) Base treatment requirements (2) Painting method II Construction technical requirements and methods of mounting Engineering (I) base treatment requirements (II) mounting method wall and column mounting commonly used methods are lapping method and splicing method Generally, the ceiling mounting method is push mounting (3) Technical requirements for mounting construction III technical requirements for soft package engineering IV technical requirements and methods for construction of detail engineering (1) the detail engineering includes five sub projects: cabinet production and installation, curtain box, windowsill, radiator cover production and installation, door and window cover production and installation, guardrail and handrail production and installation, and decoration production and installation (2) The following parts of the detailed works shall be accepted as concealed works (3) Technical requirements for guardrails and handrails Home of coatings is specialized in coatings, diatom mud, paint coating, coating technology, fire retardant coating news and coating, diatom mud, paint coating, coating technology, fire retardant coating decoration knowledge and decoration renderings,
    This article is an English version of an article which is originally in the Chinese language on echemi.com and is provided for information purposes only. This website makes no representation or warranty of any kind, either expressed or implied, as to the accuracy, completeness ownership or reliability of the article or any translations thereof. If you have any concerns or complaints relating to the article, please send an email, providing a detailed description of the concern or complaint, to service@echemi.com. A staff member will contact you within 5 working days. Once verified, infringing content will be removed immediately.

    Contact Us

    The source of this page with content of products and services is from Internet, which doesn't represent ECHEMI's opinion. If you have any queries, please write to service@echemi.com. It will be replied within 5 days.

    Moreover, if you find any instances of plagiarism from the page, please send email to service@echemi.com with relevant evidence.