    Coating technology: xingfuxia shell powder coating: shell powder construction technology

    • Last Update: 2020-04-03
    • Source: Internet
    • Author: User
    Search more information of high quality chemicals, good prices and reliable suppliers, visit www.echemi.com
    Core tip: 01 main construction tools Spraying tools: airless spraying machine, air compressor (more than 8 atmospheres), spray gun (517 and 521 nozzles for airless spraying, and 2.0-3.0mm nozzles for airy spraying) Roller coating tools: roller (size roller), long hair, medium hair, short hair (according to texture requirements), plate brush, tray Coating tools: coating gun, air compressor (more than 8 atmospheres) Scraping tools: greasy knife, trowel Container: barrel (large and small barrels), measuring cup Paint agent, top 10 Chinese wall paint brands Recommended introduction: interior wall paint and exterior wall paint can achieve beautiful, clean and pleasant effects, but the effects in different environments are different, so the color of the paint will be different There are ten brands of Chinese paint, ten brands of global paint, ten brands of Chinese wall paint, and ten brands of Chinese paint, Famous trademark of Chinese paint and coating In private rooms, most of us choose according to our own personality, personal hobbies and living habits The younger generation will choose the interior wall paint with rich colors and bright colors, while the older ones will have some working experience Home of coatings: 01 main construction tools: airless spraying machine, air compressor (more than 8 atmospheres), spray gun (517 and 521 for airless spraying, 2.0-3.0mm for airy spraying) Roller coating tools: roller (size roller), long hair, medium hair, short hair (according to texture requirements), plate brush, tray Coating tools: coating gun, air compressor (more than 8 atmospheres) Scraping tools: greasy knife, trowel Container: barrel (large and small barrels), measuring cup Mixing tool: mixer Others: masking paper, plastic cloth, shovel, hair dryer, etc 02 process flow: base inspection and treatment - > cleaning - > gap filling - > slab joint treatment - > gypsum leveling and grinding - > first full puttying - > grinding - > second full puttying - > grinding - > cleaning - > first shell powder coating (spray appropriate amount of clear water on the putty powder wall surface before the first coating is better) - > surface drying - > second shell powder coating 03 construction rules before construction, check the flatness of qualified putty (if the flatness of the wall is not good, it will affect the covering) After the internal and external corners meet the requirements, clean the floating ash on the wall and floor garbage Proportioning (diluted with clear water, unit kg) proportioning ratio roller coating: the ratio of material to water is 1:1.7-1.8 (theoretical coating area for two times is 7-10m2 / kg by weight ratio), spraying: the ratio of material to water is 1:1.6-1.8 (theoretical coating area for two times is 10-12m2 / kg by weight ratio) Elastic coating: the ratio of material and water is 1:0.5-0.8 (according to the weight ratio, the coating area varies according to the construction requirements) Scraping: the proportion of material and water is 1:0.5-1.0 (according to the weight ratio, the painting area is different according to the construction requirements) Note: in order to achieve the best painting effect, please refer to the painting method, use the material proportion, dilute according to the actual use situation, and mix evenly before use If there are undissolved shell powder particles in the paint, grind them by hand, and filter them best Roller coating and spraying of batching process 1 According to the material proportion (unit kg) of the coating area, pour a proper amount of gold shell powder coating into the seasoning container (plastic bucket, plastic basin and other clean containers can be selected according to the actual situation), add the proportion of water (unit kg) of the corresponding coating method with reference to the proportion of roller coating and spraying material in the batching proportion, and mix it for 2 to 3 minutes; 2 Make the shell powder and water fully dissolved (add color paste if necessary), and soak for 1 hour after mixing evenly (in the shade); 3 Check the prepared shell powder coating before use If there are shell powder particles that are not fully dissolved after soaking in the coating, grind them by hand, and use them after mixing evenly 4 The prepared materials shall be used immediately within 2 days Because the materials are not suitable for preservatives and other auxiliary materials, the temperature can be kept below 25oC for 48 hours If the shell powder coating stinks or precipitates, the coating cannot be used continuously Art 1 Bottom layer a: pour proper amount of shell powder coating into the seasoning container according to the material proportion (unit: kg) of the coating area, add the proportion of water (unit: kg) of the corresponding coating method according to the proportion of roller coating and spraying materials in the proportion of the ingredients, and mix it fully for 2 to 3 minutes; B: make the shell powder and water fully dissolved (add color paste if necessary), mix it evenly and soak it for 1 minute Hours or more (in the shade); 2 Texture layer a: pour appropriate amount of shell powder coating into the seasoning container according to the proportion of materials used in the brushing area (unit kg), add clean water (unit kg) according to the proportion of materials used in bullet coating in the proportion of ingredients, and mix it for 2 to 3 minutes; b: make shell powder and water fully dissolved (add color paste if necessary), and use it after mixing evenly Note: according to the different construction process, the construction process shall be increased appropriately 04 construction method before construction notice 1 Paste paper tape (masking paper or color separation paper), for the door, window frame, furniture and paint connection, paste paper tape protection, different color junction, use paper tape, newspaper or plastic bag to do a good job of protection; 2 Color matching, wall with color requirements, should accurately calculate the area in advance, once the materials used are evenly distributed; 3 Painting construction sequence: first ceiling, line, and then wall Before roller coating construction, ensure that the base material wall treatment and putty layer construction of the coated wall have met the requirements Note: if there is a phenomenon of exposed bottom (wall leakage black) on the base wall, the exposed part can be partially painted with putty powder or shell powder paint, and then the first overall painting can be carried out 1 After the first painting, check the flatness of the wall If there is any problem, use putty powder or shell powder paint to make up the surface (spray appropriate amount of clear water on the putty powder wall before the first painting is better); the interval between the second painting and the first painting is more than 2 hours (the surface is dry) 2 During roller coating, the coating on the roller shall not adhere too much, but shall be evenly stained (with the help of tray or grid), the rolling speed shall be moderate, the pressure shall be uniform, and the key to the quality of roller coating is to receive the slurry; on the painted surface, the roller can be repeatedly rolled several times to produce fine and beautiful patterns 3 Where the roller fails to roll or is missing, it shall be repaired with special roller or plate brush Before spraying construction, ensure that the base material wall treatment and putty layer construction of the painted wall have met the requirements Note: if there is a phenomenon of exposed bottom (wall leakage black) on the base wall, the exposed part can be partially painted with putty powder or shell powder paint, and then the first overall painting can be carried out 1 Before construction, strictly check whether the doors and windows, furniture, wood floor and other objects are well protected; when allocating materials, it is necessary to allocate them according to the product's water distribution proportion; first prepare a test board, adjust the discharge amount of the spray gun and air pressure; when spraying, move your arms and feet to keep up with your hands and eyes, and deal with the problems in time; When spraying, do not increase or decrease the moisture proportion of the paint (adjust according to different process requirements); 2 The determination of spraying sequence and route affects the whole spraying process; before spraying, determine the spraying starting point and spraying sequence From the general layout, follow the principle of "first far, then near, first up, then down, first inside, then out" Generally, spraying can be carried out according to the principle of first ceiling, then wall, first indoor, then aisle and stairwell 3 The spraying is divided into two times, the first spraying interval is 2 hours (before the first painting, it is better to spray appropriate amount of clear water on the putty powder wall); after the surface is dry, spray the second time Airless spraying: spray gun diameter 517 or 521, spraying pressure between 120 and 130pa 4 Airless spraying, the distance between the spray gun and the wall is 50-60cm Air spraying: the diameter of the spray gun is 2.0-3.0mm (selected according to the requirements), and the pressure is more than 8 atmospheres 5 The distance between the spray gun and the wall is 30-40cm 6 After spraying, the pasted protection shall be cleaned immediately Elastic coating construction 1 The texture size and effect of elastic coating are mainly adjusted according to the needs of customers For the texture of large color, the diameter of the spray gun mouth can be increased for construction; for the texture of small color, the diameter of the spray gun mouth can be reduced for construction 2 The distance between the shotgun mouth and the wall is about 1.5m, which is suitable After the shotgun is painted, it shall be dried 3 After the coating is completed, the pasted protection shall be cleaned immediately, and the edge of each pasted protective tape shall be straightened out by dipping the brush in water In order to reduce scratches during scraping and coating construction, it is necessary to mix ingredients with reference to the proportion of scraping and coating materials of the product in detail During the actual aging operation, it is appropriate to add water to avoid scratches; during scraping and coating construction, when polishing putty, the selected sandpaper shall be finer and the wall surface shall be flat and smooth; generally, more than two times of painting are required to achieve better results No matter roller coating, spraying, elastic coating or scraping, the oil and ash brought in during construction shall be removed immediately Tools cleaning roller, plate brush, tray and other tools shall be cleaned immediately after use to extend the service life of tools 05 after the completion of cleaning, the floor and windows shall be cleaned immediately to remove the protection and leave the clean space to the user 06 precautions please read the construction instructions in the product packaging carefully before use to obtain reliable and satisfactory coating effect 1 The putty powder used for the foundation wall shall match the shell powder, and the shell powder coating manufacturer shall designate the putty powder or special putty powder for shell powder coating 2: This product belongs to water-based coating, please do not mix it with solvent based coating during construction; 3: the prepared materials shall be used immediately within 2 days (because the materials do not contain preservatives and other auxiliary materials, the temperature can be kept below 25oC for 48 hours, if the shell powder coating stinks or precipitates, the coating can not be used continuously); 4: Open all doors and windows as much as possible before operation and use to ensure that the construction area has sufficient ventilation conditions; 5 In order to maintain the cleaning of the construction site and ensure the best coating effect, please effectively separate and cover the important areas such as furniture, doors and windows, and do a good job of protection; 6 After the coating surface is dry, you can move in normally on the same day; 7: Air leakage of vacuum packaging does not affect normal use and product shelf life (vacuum packaging is only for the convenience of transportation and storage) Home of coatings is specialized in coatings, diatom mud, paint coating, coating technology, fire retardant coating news and coating, diatom mud, paint coating, coating technology, fire retardant coating decoration knowledge and decoration renderings,
    This article is an English version of an article which is originally in the Chinese language on echemi.com and is provided for information purposes only. This website makes no representation or warranty of any kind, either expressed or implied, as to the accuracy, completeness ownership or reliability of the article or any translations thereof. If you have any concerns or complaints relating to the article, please send an email, providing a detailed description of the concern or complaint, to service@echemi.com. A staff member will contact you within 5 working days. Once verified, infringing content will be removed immediately.

    Contact Us

    The source of this page with content of products and services is from Internet, which doesn't represent ECHEMI's opinion. If you have any queries, please write to service@echemi.com. It will be replied within 5 days.

    Moreover, if you find any instances of plagiarism from the page, please send email to service@echemi.com with relevant evidence.