Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
- Cosmetic Ingredient
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
Construction
substrate requirements and substrate treatment:
substrate needs to be professionally treated, should have carrying capacity, and solid dry; The loose, peeling parts should be removed and repaired in a timely manner. The weak absorbent and smooth and dense substrate does not carry out the bottom coating treatment
the
. Other detailed requirements can be found in the Construction and Acceptance Specifications for Construction and Acceptance of Building Decoration Works JGJ73-91 or the local specifications.
For the grass that does not meet the coating requirements need to be professional treatment:
- - wall damage, cracks, unevenness and other parts before the bottom of the application with low alkaline putty to repair the flat;
- new concrete and cement mortar, mixed mortar dust base, need to go through 2-3 weeks of ventilation drying maintenance period, so that the grass before painting water content <10%, PH value <10;
- - For lightly powdered, solid old coatings can be applied with a matching base. The old coating, which is heavily powdered, should be thoroughly cleaned in advance and the old oily coating removed completely.
- For non-carrying, crispy, peeling old coatings, they should be thoroughly removed, washed, and dried before flattened with putty.
colors: all colors in the white and infinity cards, you can also sample the computer color by customer.
use:
suitable for high-end villas, high-end residential, high-end hotels and other
interior decoration, including interior walls, ceilings, plasterboard, etc.,
to create a harmonious and elegant atmosphere.
recommends supporting
primer: a special primer layer;
paint: wall paint 2-3 layers.
construction: dry paint film thickness 3 s micro;m/layer.
theory paint consumption: 12m2/L/layer.
construction methods: brush coating, roller coating, airless spraying.
Safety Matters
1, be sure to read the construction instructions in the product packaging text carefully before use to obtain reliable and satisfactory coating results
2, open all doors and windows as far as possible before starting operation and use, to ensure that there are sufficient construction areas Ventilation conditions
3, if allergic skin, should always wear protective equipment during use, if accidentally stained with eyes, should immediately rinse with a large amount of water, and seek medical help
4, do not let children or pets Enter the construction area and place the product out of contact, if accidentally contaminated, rinse immediately with plenty of water, and seek medical assistance
5, effectively separate, cover and cover the wood and wall areas to better maintain the construction site Clean, avoid chaotic construction operation, and in accordance with the first construction wood paint, to be dried and then the construction order of latex paint to operate
6, when the paint knocks over the leakage, with sand or soil cover after collection and reasonable disposal, Do not pour paint into sewers or drains to prevent