echemi logo
Product
  • Product
  • Supplier
  • Inquiry
    Home > Coatings News > Paints and Coatings Market > Dyeing curing agent floor construction process

    Dyeing curing agent floor construction process

    • Last Update: 2021-04-19
    • Source: Internet
    • Author: User
    Search more information of high quality chemicals, good prices and reliable suppliers, visit www.echemi.com

    Dyed concrete sealing and curing agent floor can permanently improve the strength and hardness, permanent sealing, impermeability, permanent curing of the concrete, permanent no dust, super binding ability, saving a lot of repair and maintenance costs, and can make various Floors of various colors are more beautiful than the original colors.

    The dyeing sealing curing agent is the same as the original color sealing curing agent.
    It is suitable for underground garage floors, industrial plant floors, logistics warehouse floors, indoor and outdoor industrial floors, large shopping malls, supermarkets, food factories, pharmaceutical factories, and electronics.
    The ground of the communication workshop, the ground floor, the dust and sand treatment, the old ground renovation, and the low hardness of the cement floor are caused by the deployment of different colors according to the needs of customers to meet the diverse needs of customers.

    Floor staining agent has so many advantages, how is it applied?

    1.
    Basic ground treatment

    1

    The new cement floor is cured for two weeks/the terrazzo is cured for 7-10 days, and the dirt on the concrete floor (such as cement slag, paint block, garbage, dust, etc.
    ) is com" href="">cleaned up .
    com" href="">Online coatingol.
    com .

    2

    Polishing the ground: the first step of polishing the base surface (water mill): the base surface uses a 100-mesh polishing pad, and the floor professional sanding machine is used for polishing; the second step of polishing the base surface (water milling): the base surface uses a 150-mesh polishing pad, and the floor is used Professional polishing machine for polishing; the third step of base surface polishing (water mill): The base surface is polished with a 300-mesh grinding disc and a floor grinder.

    3

    After grinding, use a water suction device to clean the sewage from the ground.
    The concrete sealing curing agent can be applied after the ground is 80% dry.


    Spray the product on the ground with an amount of about 0.


    4

    After the material fully reacts with the ground (the reaction time is usually 6-8 hours); change the 500-mesh grinding disc and continue to polish the ground.
    After the ground is polished, keep the ground dry; when constructing in the basement or in autumn and winter, the ground should be air-dried for more than 12 hours.
    In a construction environment with poor ventilation, a blower must be used to dry the ground.


    Try to avoid secondary pollution during the drying process, so as not to affect the dyeing effect in the next dyeing process.


    2.
    Ground dyeing treatment

    1

    After the first application of the staining agent, the ground will absorb the staining agent unevenly, and part of it will dry quickly, so the second application of the staining agent will be required for this part of the ground.

    When applying the stain for the second time, increase the amount of brushing on the faster dry part, and increase the smearing area.

    2

    After applying the stain twice, wait for the ground to dry so that the stain fully penetrates the ground.
    When the ground is drying, impurities will appear on the surface of the dye and the color will become darker.

    3

    After the dyed ground is completely dry, use a 1000-mesh resin polishing pad to dry the ground to remove impurities on the surface of the dyed ground.

    4

    After dry grinding with 1000 mesh resin grinding discs, the ground may have inconsistent colors.
    At this time, a small amount of staining agent needs to be applied to the lightly colored areas to ensure that the ground staining agent is uniform and there is no difference in surface color.


    After applying the dye, wait for the ground to dry.


    3.
    Ground fixing treatment

    1

    After the floor dye is completely dried, use a spray can to spray the fixing agent on the floor at a dosage of 0.
    1-0.


    2 kg/m2.



    2

    A high-speed polishing machine is equipped with a scouring pad to fix and polish the ground.



    After completing the above procedures, it can be visited after 24 hours, and it can be delivered for use within 48 hours.



    This article is an English version of an article which is originally in the Chinese language on echemi.com and is provided for information purposes only. This website makes no representation or warranty of any kind, either expressed or implied, as to the accuracy, completeness ownership or reliability of the article or any translations thereof. If you have any concerns or complaints relating to the article, please send an email, providing a detailed description of the concern or complaint, to service@echemi.com. A staff member will contact you within 5 working days. Once verified, infringing content will be removed immediately.

    Contact Us

    The source of this page with content of products and services is from Internet, which doesn't represent ECHEMI's opinion. If you have any queries, please write to service@echemi.com. It will be replied within 5 days.

    Moreover, if you find any instances of plagiarism from the page, please send email to service@echemi.com with relevant evidence.