Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
- Cosmetic Ingredient
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
Into the → finished product protection→ wall repair scraping putty → roll-seal primer→ paste patch tape→ cover paint twice→ dressing clean.
construction process: primer, TY-2010 acrylic coating. Features: strong decoration, water resistance, excellent weather resistance, do not fall off, unchanged color,
chinese
. Construction requirements
1, the substation must be flat, solid, clean, dry, water content of < 10%. 2, the wall temperature must not be lower than 5 degrees C, high winds, rainy days should not be suitable for operation. 3, scaffolding from the wall to maintain a distance of about 20 cm. The construction process before the construction of the grass-roots first of all to carry out the necessary treatment, so that it is: strong and strong, that is, no loose, missing corners, drum bags, cracks, holes;
Specific treatment: pan-alkali in the treatment agent after the reaction with clean water, difficult to deal with the old paint film of flotation oil if necessary with a wire brush removed clean, cracks are large or very uneven wall, re-plasmed to flat, then scrape putty, grinding, to dry after the next process. After the basic treatment, brush a primer, requires a uniform brush, do not leak brush primer dry, paste imitation brick tape to separate the need for size of the grid, roll brush or spray paint, to achieve high-performance, high decorative effect, construction method with roller brush or spray gun evenly painted twice, interval of >2 hours, and finally tear off the split tape.
security measures: quality is life, safety benefits. Grasp the quality at the same time, but also to put an end to the occurrence of safety accidents. Full-time personnel are responsible for the safety of construction site personnel, prohibit staff vertical operation. Safety officers hold safety meetings before construction, and check tools, equipment, etc. and preparation to eliminate hidden dangers. Construction site clean and tidy, do a good job of civilized hygiene.
to do a good job of product protection: that is, to prevent damage to the structure, while doing a good job in the construction of finished product protection work, paint construction on the ground and other items to protect, and prevent pollution of the wall after construction.
。