echemi logo
Product
  • Product
  • Supplier
  • Inquiry
    Home > Active Ingredient News > Drugs Articles > Maintenance work of rotary mechanical grille cleaner after installation

    Maintenance work of rotary mechanical grille cleaner after installation

    • Last Update: 2016-05-13
    • Source: Internet
    • Author: User
    Search more information of high quality chemicals, good prices and reliable suppliers, visit www.echemi.com
    After the mechanical grid is installed, corresponding maintenance work shall be done to ensure the operation of the equipment The corresponding maintenance work is as follows: 1 After the mechanical grid is hoisted in place, pay attention to adjust the interface between the equipment and the root, the water trough, the foot bolts and other positions of each other 2 The smooth operation of the mechanical grille shall be done carefully, and the outstanding smooth state of the transmission (rotating) parts shall be adhered to Motor, reducer, bearing and other oiling parts shall be replaced with smooth oil and grease as required It should be noted that when the equipment is working, it is forbidden to manually clean or smooth the material, and it is forbidden to stay near the transmission chain guard 3 If the reducer base is removed due to the transportation demand, it should be recovered first, pay attention to the transmission axis of the two sprockets, and install the inspection chain and chain cover 4 Check the mechanical grille regularly, such as the working condition of motor and reducer, and replace the worn parts in time The large and medium repair periods shall be determined together, and the maintenance shall be carried out on time Always check whether the toggle bracket assembly is sensitive, timely remove the foreign matters in the clamp, and check whether the screws of each component are loose 5 In the process of loading and unloading, the rotary mechanical grille shall adhere to the level of equipment, pay attention to the damage of loading and unloading rigging to the equipment and provide protection 6 In case of any abnormal condition or signal during the work, stop the machine immediately, cut off the power supply, check it, remove the fault in time, and do not start it forcibly to prevent the accident The new equipment shall be replaced with new oil after one week's refuelling operation for * times, and the internal oil stain shall be washed clean After that, it shall be replaced every 3-6 months (six months for the equipment running for 8 hours every day, three months for the equipment running for 24 hours in a row) The reducer motor shall always maintain the appropriate oil level and fill with appropriate oil When the ambient temperature is - 10 ℃ ~ 0 ℃, N46 and N68 shall be used for lubrication Oil, N68, N150, N220 lubricating oil is used at 0 ℃ ~ 40 ℃ More contents can be viewed: Guangzhou LVYE environmental protection equipment Co., Ltd
    This article is an English version of an article which is originally in the Chinese language on echemi.com and is provided for information purposes only. This website makes no representation or warranty of any kind, either expressed or implied, as to the accuracy, completeness ownership or reliability of the article or any translations thereof. If you have any concerns or complaints relating to the article, please send an email, providing a detailed description of the concern or complaint, to service@echemi.com. A staff member will contact you within 5 working days. Once verified, infringing content will be removed immediately.

    Contact Us

    The source of this page with content of products and services is from Internet, which doesn't represent ECHEMI's opinion. If you have any queries, please write to service@echemi.com. It will be replied within 5 days.

    Moreover, if you find any instances of plagiarism from the page, please send email to service@echemi.com with relevant evidence.