echemi logo
Product
  • Product
  • Supplier
  • Inquiry
    Home > Active Ingredient News > Drugs Articles > One time solution of water-proof by plugging air bag of pipeline

    One time solution of water-proof by plugging air bag of pipeline

    • Last Update: 2017-10-20
    • Source: Internet
    • Author: User
    Search more information of high quality chemicals, good prices and reliable suppliers, visit www.echemi.com
    The sealing air bag of the pipeline can prevent water at one time, and the maintenance is no longer repeated [Zhuzhou complete science and technology factory direct sales free personal installation scheme] in the 21st century, the level of urban modernization is developing rapidly, and the construction of comprehensive pipe gallery is springing up all over the country At the same time, the quality and safety of the construction of the comprehensive pipe gallery are paid more and more attention While paying attention to the construction quality of the underground pipe gallery, the complete scientific and technological experts pointed out that in the construction of the comprehensive pipe gallery, the seepage of the underground pipe gallery needs to be paid attention to, which directly affects the quality of the project and the later maintenance work Among them, one of the main reasons for the leakage of underground pipe gallery is the confusion of waterproof construction process and site management For the construction of underground comprehensive pipe gallery, it is urgent to put on the waterproof coat Pipe sealing air bag solves waterproof at one time Let's learn about waterproof sealing of cable pipe Serious leakage of underground pipe gallery The inevitable mission of waterproof engineering is to prevent the infiltration of all-round environmental water into the multi-phase and porous reinforced concrete system, to avoid corrosion of reinforcement and concrete, to extend the durability of the structure, and to protect the main structure If the underground pipe gallery wants to give full play to its role in urban construction and operation, it is necessary to do well in waterproof and ensure safety It is understood that there are generally three ways for waterproofing construction of underground pipe gallery, one is open excavation, which adopts the method of structural self waterproofing and full outsourcing waterproof layer In case of sufficient foundation pit construction conditions, the outer wall should be paved with waterproof layer by external anti sticking method; The second is the concealed excavation method In addition to the self waterproofing of the structure, the pre laid waterproof roll, waterproof coating or plastic waterproof board are set between the initial support and the secondary lining to form a liner waterproof system The waterproof layer is used to separate the water in the surrounding rock from the secondary lining; The third is prefabrication and assembly method The main pipe adopts self waterproof and external waterproof design, that is, the prefabrication main pipe is coated with waterproof coating, and the core is the integration of prefabrication pipe joints As the artery project of urban underground facilities, the comprehensive pipe gallery has a long-term strategic significance for urban construction, but the problem of water leakage has always been a common quality problem of underground construction projects According to experts, according to some of the projects that have been built, the main problems of Zui, such as deformation joint, construction joint and leakage of through wall pipe in the underground pipe gallery, have not been completely solved, which once became a problem that troubled the construction and maintenance of the underground pipe gallery The underground pipe gallery usually covers high-voltage cables and weak current cables, and shall be set up separately If there are wet spots or water seepage in the comprehensive pipe gallery structure, it means that the comprehensive pipe gallery is wet, which is easy to cause corrosion of high-voltage cable and weak current cable connectors and high-voltage cable ignition, seriously affecting the normal operation of the equipment at the load end and the safe operation of the project In addition, concrete will be eroded by groundwater in underground engineering, and its durability will be affected At present, the groundwater in China, especially the shallow groundwater, is seriously polluted, and the waterproof concrete is not an impermeable material According to the measurement, the permeability parameter of the waterproof concrete with the impermeability grade of p8 is (5 ~ 8) × 10-10cm / s Therefore, the erosion and damage of underground water to concrete structure and steel bar of underground pipe gallery project is a problem that can not be ignored Then, is the air bag blocked to solve the water-proof problem and avoid repeated maintenance? It is one of the technical problems that must be considered in the construction of the comprehensive pipe gallery to put an end to the phenomenon that the pipeline has been soaked in the leakage water for a long time and solve the waterproof problem well It can effectively solve the waterproof problem so as to ensure the construction quality of the comprehensive pipe gallery It can also fundamentally reduce the potential safety hazards, reduce the later operation and maintenance costs, and extend the service life of the pipe gallery The waterproof grade shall be determined according to the pipeline type of the specific pipe gallery If there are important lines such as high-voltage cable, weak current and communication transmission entering the pipe gallery, and moisture and leakage are likely to cause corrosion and ignition of the connecting parts, the waterproof layer shall be grade I waterproof, and these lines shall also be separately set up "In the construction, the underground water and surface water conditions of the city where the pipe gallery is located should be considered For example, in the city where the surface water drainage is not smooth, even if the underground water level is very low, the first-class waterproofing should be done If the area with rich underground water content, the first-class waterproofing is more stable." Some experts said that "at present, the secondary waterproofing in the technical specifications for urban comprehensive pipe gallery engineering should be adjusted to be no less than the secondary level, which should be more appropriate." Underground pipe gallery is not a new thing, waterproof engineering is also a commonplace But only if we do a good job in waterproofing can we ensure that the underground pipe gallery will become a century old project and promote the healthy and orderly development of the whole city More importantly, the waterproof industry should also take advantage of the rare opportunity brought by the construction of underground pipe gallery, increase innovation and standardization in materials, technology and construction, and then promote the transformation and development of the whole industry Wqbz type inflatable cable duct is widely used for waterproof sealing of underground cable duct, high-voltage cable, weak current and communication transmission pipeline to effectively prevent water, sediment, insects, rats, harmful gases and other substances from entering the pipeline The national inflatable pipe waterproof sealing product produced by Zhuzhou complete science and Technology Co., Ltd is the core component of the product "inflatable pipe plug", which is a sealed air bag made of polymer aluminum foil composite material The sealing effect of the pipe hole is realized by the principle of inflatable expansion Two sides of the inflation pipe plug are pasted with waterproof rubber strip When the product is inflated to 2.6-2.8kg air pressure, the gap between the pipe, the inflation pipe plug and the cable is well filled to achieve the complete sealing effect Silica gel material is installed on the inner side of the gas filling hole of the gas filling pipe plug When the gas filling is completed and the gas filling pipe is pulled out, the self filling performance of silica gel material can block the gas filling hole to ensure that the gas does not leak The application characteristics of inflatable cable duct plugging airbag products are as follows: 1 It can meet the needs of air duct, multiple cables passing through a single pipe, etc 2 The sealing effect is good After sealing at both ends, the water, sediment, harmful gas, insects and rats in the pipeline can be completely isolated and kept dry and clean 3 The installation conditions are low, and various gas sources can be selected independently; the installation is fast, and the operation can be completed by one person; the removal of later maintenance is simple, without damaging the cable and pipe wall 4 After the correct installation, the service life is up to 20 years without human damage 5 Wide working temperature difference (-15 ℃ - 60 ℃), strong resistance to acid and alkali corrosion of underground water, and able to withstand the cable axial tension and low-frequency vibration 6 Scope of application: it is mainly used for plugging underground pipe network and cable pipe holes of electric power, communication, urban construction and urban rail transit, and for plugging through wall holes of underground civil engineering walls in commercial and residential communities; it is suitable for pipes of rigid materials such as plastic, steel, cement, etc.; it is suitable for round or oval sealing holes 7 The product has certain fire-retardant effect 8 Secondary installation and utilization can be realized according to the needs of customers If the air filled pipeline waterproof plugging product is used as early as possible in the urban power underground pipe network, it can effectively improve the cable protection level and operation safety factor in the pipeline, and avoid the large amount of capital and manpower invested in dredging repeatedly in the later stage It will not affect the later cable laying and replacement Warm tip: This is a network reprint from the waterproof enterprise network Zhuzhou complete science and Technology Co., Ltd is an expert in power pipeline plugging It aims to spread more industry information and invade and delete! Zhuzhou complete science and Technology Co., Ltd sincerely provides technical solutions to the following related problems: pipeline plugging airbag products, cable duct, cable duct sealing, cable duct sealing, cable duct waterproof, pipe sealing, cable duct waterproof, etc
    This article is an English version of an article which is originally in the Chinese language on echemi.com and is provided for information purposes only. This website makes no representation or warranty of any kind, either expressed or implied, as to the accuracy, completeness ownership or reliability of the article or any translations thereof. If you have any concerns or complaints relating to the article, please send an email, providing a detailed description of the concern or complaint, to service@echemi.com. A staff member will contact you within 5 working days. Once verified, infringing content will be removed immediately.

    Contact Us

    The source of this page with content of products and services is from Internet, which doesn't represent ECHEMI's opinion. If you have any queries, please write to service@echemi.com. It will be replied within 5 days.

    Moreover, if you find any instances of plagiarism from the page, please send email to service@echemi.com with relevant evidence.