echemi logo
Product
  • Product
  • Supplier
  • Inquiry
    Home > Active Ingredient News > Drugs Articles > The nine steps of using pillow packing machine correctly

    The nine steps of using pillow packing machine correctly

    • Last Update: 2020-02-10
    • Source: Internet
    • Author: User
    Search more information of high quality chemicals, good prices and reliable suppliers, visit www.echemi.com
    Pillow packing machine is a kind of common packing machine Today, I will introduce nine steps of correct use of pillow packing machine: 1 Start up: (1) before starting up, remove the obstacles and personnel that affect the safety operation around the equipment, and check whether the speed control knob is in the "zero" position (2) the starting sequence of the whole set of equipment is: shale shaker - (feeding system) - (conveyor belt) - (bag cleaning machine) - (bag following machine) - (bag unloading machine) - (packaging machine) - (feeder) (3) adjust the speed control knob clockwise, and gradually accelerate to the working speed, generally 3-5R / min if there is no abnormality, the bag can be inserted for operation 2 Stop the machine: stop the feeding first, and then stop the machine in the following order: feeder - (empty the materials in the rotating cylinder) - packaging machine - bag unloading machine - bag following machine - bag cleaning machine - vibrating screen Cleaning and maintenance equipment 3 Temporary stop and emergency stop: (1) temporary stop: if temporary stop is needed, turn the speed button back to the "zero" position to stop the packaging machine, and press the rotation stop button at the same time (2) emergency stop: in case of any accident, emergency stop measures shall be taken, and the emergency stop button shall be pressed At this time, except for the vibrating screen, all other equipment shall stop working After the shutdown, the speed control knob shall be turned back to the "zero" position 4 Before work, first check the condition of the equipment and check whether there are obstacles and other personnel within the safe operation range of the equipment The operators shall have safety awareness and be trained to work 5 When inserting bags, the operator should keep his body away from the equipment as far as possible, and tie the cuff of work clothes and the clothing report to prevent scratching 6 When the equipment is temporarily shut down, the personnel shall not be near the packaging machine If it is necessary to do so, the power supply of the rotating motor shall be cut off 7 The power supply shall be cut off during maintenance If live inspection is required, warning signs shall be hung or special personnel shall be assigned for supervision 8 During the working process of the packaging machine, it is not allowed to touch the packaging bag to avoid affecting the measurement accuracy 9 When repairing the equipment, it shall be operated by professional personnel, and the equipment shall be restored according to the technical requirements After using the equipment, it shall be cleaned and inspected, and attention shall be paid to the sealing of the distribution box, the completeness of each part, the looseness of each screw, and the change of the gap.
    This article is an English version of an article which is originally in the Chinese language on echemi.com and is provided for information purposes only. This website makes no representation or warranty of any kind, either expressed or implied, as to the accuracy, completeness ownership or reliability of the article or any translations thereof. If you have any concerns or complaints relating to the article, please send an email, providing a detailed description of the concern or complaint, to service@echemi.com. A staff member will contact you within 5 working days. Once verified, infringing content will be removed immediately.

    Contact Us

    The source of this page with content of products and services is from Internet, which doesn't represent ECHEMI's opinion. If you have any queries, please write to service@echemi.com. It will be replied within 5 days.

    Moreover, if you find any instances of plagiarism from the page, please send email to service@echemi.com with relevant evidence.