-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
- Cosmetic Ingredient
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
Industrial floor coating construction requirements are based on the design requirements, and the process steps of the floor plan are as follows:
(1) Material description Waterborne polyurethane mortar series industrial floor materials are high-performance floor coating materials with a wide range of uses and different loads.
It uses special machinery to remove surface cement foam and form necessary roughness after 15 days of curing period of ordinary concrete or 7 days after the polymer-improved screed layer.
It is evenly coated on the surface by machinery or hand and waited for it to be completely cured.
A seamless, dust-free, strong, high-load, acid and alkali-resistant protective layer is formed on the ground.
(B) Preparation conditions of construction and the construction and floor construction week after the indoor temperature should be controlled at + 15- + 25 ℃, the working environment of air relative humidity less than 70% com" href="">the coating line coatingol.
com .
(3) Basic treatment of waterborne polyurethane mortar floor construction process 1.
1 Clean the ground.
If it is an elastic polyurethane floor system, then perform the following operations: use a special elastic polyurethane primer to coat along the cracks with a working width of 100mm to bridge the work.
Crack Type B: The width is greater than 5mm and less than 8mm, adopt the following treatment methods