-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
- Cosmetic Ingredient
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
China Paint Online News Information
1. Concrete base pouring: concrete strength label requirements of ≥C25, pouring thickness to customers to determine, generally more than 30mm cement mortar or more than 50mm fine stone concrete;
2. ultra-hard wear layer construction: to the initial concrete coagulation (refers to pressure testing) Leave 3-5mm imprint), first of all, 2/3 amount of alloy material vertical, cross evenly spread, so that the material fully absorbs the water in the concrete, with the polish mechanical construction to smooth;。 3. Maintenance and cutting telescopic seams: after construction can be used maintenance agents (water plus film, wax, high osmosis seal curing agent) to carry out maintenance; 8m (generally determined according to the distance of the workshop column), cutting should be unified bullet line, to ensure that the cutting seams are neat and straight, without affecting the beauty of the floor; It can be used normally after 28 days of maintenance.
。